My WebLink
|
Help
|
About
|
Sign Out
Home
COM 0596.001 2020-2022
ClerkCouncil
>
Council Records
>
Communications
>
2020-2022
>
COM 0596.001 2020-2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2022 3:36:54 PM
Creation date
2/1/2022 3:04:55 PM
Metadata
Fields
Template:
Communications
Communications - Type
COM
Communications - Council Term
2020-2022
Communication
596
Point
001
Author
Zendo Kern, Planning Director
Communications - Referred To
PC
Document Relationships
AGE PC 2022/02/08 (2020-2022)
(Related)
Path:
\Council Records\Agendas\2020-2022\Planning Committee (PC)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
kind of wanted to add on that is the fact that fortunately in this situation here the commission's <br /> role is merely recommendatory. It's a decision that the Commission will be recommending to <br /> the County Council is unlike the first application where your decision is final, so that kind of like <br /> reduces some of the I think this thing to the potential conflict issue. Having said that,just to <br /> provide some further emphasis on the application. The property received a Use permit back in <br /> 2013 for a medical facility and was explicitly designed for only for medical operation. However, <br /> we know that you had in 2014 there was an eruption and was followed again in a more major one <br /> in 2018 and that kind of like threw the plans totally off. <br /> So, in 2019 after the last 2018 lava flow, the thought was maybe to have this property be <br /> expanded in its use by creating more like a community hub. So, you had thenkind of like work <br /> with the County, and they constructed 3 of the structures that you saw on the staffs map. They <br /> all received the Certificate of Occupancy but along the way, the idea was that,having the <br /> property used and restricted only to medical use was not really fulfilling in his mind and for the <br /> community. Because we know that the County had recently completed the Kilauea Recovery <br /> and Resilience Plan. So, the thought was by having a commercial zoning in that area, this <br /> property could further help implement or support the Resilience Plan that was adopted by the <br /> County for this area by providing for whole bunch of uses. So, to be able to do that, you need to <br /> have the property rezoned from Residential to Commercial and that's the reason why we're here. <br /> The first phase, he already has these structures, money's have been invested for them, so the idea <br /> was essentially just to convert those existing structures into any sort of a commercial uses that <br /> the community deems appropriate. And then, secondly, ultimately the goal is to create like a <br /> single-story structure consisting of about 13,000 square feet, that would have like multiple uses <br /> medical, commercial, so on and so forth. At the same time,because this site at one point in time <br /> was considered by the County as a transit hub. The applicant is willing to really continue the <br /> discussion with the County at the County's initiation if the County wants to use all of it or a <br /> portion of it for any transit hub or things that would help implement the Resilience Plan and the <br /> applicant is totally receptive to that. Born and raised and living in that community so his going <br /> to be doing everything he can to help out the lower Puna district. <br /> The staffs background report kind of pointed out that the properties within the General Plan <br /> Medium Density area it complies with also the policy portion of the General Plan. More <br /> critically it's consistent with the Puna CDP, especially the Pahoa Regional Town Center. In your <br /> background report, you will see an internal communication between the Long-Range division of <br /> the Planning Department to this division noting that the property would be the projected rezoning <br /> rather is consistent with the Pahoa Regional Town Center. All of the basic infrastructure are <br /> there the water,the access, the wastewater system it's all going to be complied with and <br /> specifically addressed as kind of outlined in the staff's background report and the conditions. <br /> I think the most troublesome one relates to Condition K, which calls for the requirement of curb, <br /> gutters,and sidewalk fronting the properties. The applicant has major reservations in that it for <br /> two reasons, one was that whether it would really be befitting of this area to have like this urban <br /> type of environment, urban type of infrastructure curb, gutters, and sidewalk. In an area that's <br /> . very rural and, secondly, is that, in addition to the cost wise. There are like alternative ways to <br /> address the need for safe pedestrian movement in that area. And to help illustrate that point I'd <br /> 7 <br /> EXHIBIT C (DRAFT) <br />
The URL can be used to link to this page
Your browser does not support the video tag.