Laserfiche WebLink
Mr. Zendo Kern; Director <br /> March 21, 2022 <br /> Page 4 <br /> Slaughter House Road. Prior to receipt of la Certificate of Occupancy/ <br /> final subdivision approval, the applicant shall improve the road and utility <br /> easements over TIIK s 1-6-1X11: 001. 024, 027, and 028 to provide road <br /> improvements meeting the County Department of Public Works Standard <br /> Details R-33 and R-34 to include travel lanes. shoulders and drainage <br /> swedes within a 60-fiat wide right-of-way The improvements within the <br /> 60-/bot wide right-of-way shall be privately owned and maintained unless <br /> a road lot is created and dedicated to the County of Hawaii. " <br /> (Bracketed items to be deleted; underscored items to be added.) <br /> JUSTIFICATION OF REQUEST <br /> 1. Requirements Applicable to Subdivision <br /> As noted earlier, the Planning Department's staff report associated with the <br /> rezoning of the subject property from A-20a to MG-20, noted that "The General <br /> Plan and Subdivision Code state that industrial streets shall have a right-of-way <br /> width of 60 feet with a minimum pavement width of24,feet. " (Emphasis added) <br /> This was the basis for the Department recommending compliance with the <br /> Standard Detail R-33 and R-34. <br /> The requirement for the industrial or commercial level road is specifically <br /> triggered or called for in the Subdivision Code. It is not necessarily triggered <br /> when one seeks a building permit for a permitted use. <br /> For example, if one were to construct a warehouse (industrial use) on a portion of <br /> a larger parcel, there would be no requirement for having a 24-foot wide pave <br /> road within a 60-foot right-of-way to access the warehouse. Li.ketivise, if four(4) <br /> single-family dwellings were constructed on an acre of property zoned RS-10, <br /> there would be no requirement to have a County approved road to each of the <br /> dwelling. <br /> However, in both situations, should the property upon which the warehouse is <br /> situated is to be subdivided from the balance of the property or the area of <br /> the four (4) dwellings are to be subdivided into four (4) lots, the Subdivision Code <br /> relative to access and associated infrastructure, even on a de facto basis, would <br /> have to be complied with. <br /> Likewise, the water requirement is driven by the Industrial Zoning and any <br /> subdivision based on that zoning designation. This requirement or standard, like <br /> the road improvement requirement, would not be applicable if a use were <br /> permitted with a Special Permit. Accordingly,you will note that neither the <br /> original Special Permit nor any of its extension included the language or <br /> requirements of Conditions E and I. <br />