Laserfiche WebLink
PIPAN: Well, it depends if it's, if it's just talking about the on-site-- <br /> VITOUSEK and KANUHA: On-site. <br /> PIPAN: That's, that's probably about 500 feet or so. And again— <br /> VITOUSEK: And what was the linear foot estimate? <br /> PIPAN: Let's say$400 to be kind of middle of the road. Four hundred dollars per linear <br /> foot. But again, this is shots in the dark, back of the envelope calculations= <br /> VITOUSEK: Yeah. <br /> PIPAN: That's on top of building a septic system when you build a house. So that cost-- <br /> VITOUSEK: That would be for the lot there. <br /> PIPAN: Yeah, that cost is built into the cost of the lot, but they also have to then build a <br /> septic system. <br /> VITOUSEK: Perhaps, right? If it hasn't gotten there by then. Perhaps they would have to <br /> build it. <br /> PIPAN: Perhaps. <br /> VITOUSEK: The other option, have you considered what it would be like to, down the <br /> road, retrofit and upgrade to sewer? <br /> PIPAN: Well— <br /> VITOUSEK: Digging through the road— <br /> PIPAN: Yeah, certainly that wouldn't be ideal either. <br /> KANUHA: I think that would be a lot worse. <br /> VITOUSEK: Right. That would be a lot worse, right? So, that's the idea is that we look <br /> into what we could do before. <br /> CHEN: Yes, certainly Mr. Chairman, it's about the cost. You mentioned earlier, since <br /> we want acre lots available, but the reason that I wanted bigger lot on this whole entire <br /> 24 <br /> EXHIBIT F <br />