My WebLink
|
Help
|
About
|
Sign Out
Home
COM 0953.001 2022-2022
ClerkCouncil
>
Council Records
>
Communications
>
2020-2022
>
COM 0953.001 2022-2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2022 1:06:21 PM
Creation date
8/29/2022 1:20:23 PM
Metadata
Fields
Template:
Communications
Communications - Type
COM
Communications - Council Term
2020-2022
Communication
0953
Point
001
Author
Zendo Kern, Planning Director
Communications - Referred To
PC
Document Relationships
AGE PC 2022/09/06 (2020-2022)
(Related)
Path:
\Council Records\Agendas\2020-2022\Planning Committee (PC)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
In 2017, when the applicant came before the Planning Commission this was the proposed site <br /> plan that they had submitted to us. It included the existing solar array farm, which is currently <br /> there, as well as some of the microbrewery covered lanai, a beer sampling area and parking for <br /> the use. Up until this point, it's my understanding as well as what the applicant has submitted <br /> that none of this has been developed yet. <br /> In 2021, the applicant completed a CPR of the subject property. Where they did provide a <br /> separate lot which is for the current PV array so, before you this is the CPR map that was <br /> submitted by the applicant. <br /> These are the current site photos of the subject property. To the left you have a view of the <br /> entrance of the subject property facing east. So, this is at the end of Shipment Road which is <br /> formerly known as Slaughter House Road for those of you familiar with the area. Shipman Road <br /> continues on to the left in this northern direction and straight ahead is the applicant's existing <br /> entrance to the subject property. This is actually the start of TMK 1 and 24, where two side by <br /> side roadway and utility easements are located that access the subject property as well as the <br /> distilling that's located further east. <br /> The photo on your right is a photo of you driving further east on the subject property. However, <br /> you're facing north, and it currently shows the existing solar panel array on the property. Other <br /> than that, there isn't anything else located on the subject property at the moment. <br /> On the screen before you is the applicant's proposed amendments to Condition E. As you can <br /> see the applicant has proposed to amend the timing trigger for the fire improvements to be final <br /> subdivision approval. And again, the applicant's proposed amendment to Condition I include the <br /> timing trigger for the applicant's roadway improvements to be final subdivision approval as well. <br /> Currently the Planning Director is recommending forwarding a favorable recommendation to the <br /> County Council. However, he is recommending modifications for the applicant's proposed <br /> amendments to Condition E and Condition I of Ordinance No.17 65. So, on your screen before <br /> you I have the Planning Director's recommended proposed language and his proposed <br /> modifications to the request. On the right-hand side, you have the applicant's proposed language <br /> which was discussed earlier that he is currently proposing to remove the timing trigger of <br /> Certificate of Occupancy to final subdivision approval. And to the right of your screen is the <br /> Planning Director's view on this. So, the one thing that I wanted to note about the Planning <br /> Director's recommendation is that the Planning Director believes that the timing trigger for this <br /> condition should not be changed. The Planning Director understands that the Fire Department <br /> will review the plans at some point or another against their Code. Based on that, the Planning <br /> Director does not support the applicant's request to defer the timing trigger. However, the <br /> Planning Director is recommending to add that last statement that allows for the Fire Department <br /> to review this at any time and determine when they feel their Code needs to be made. <br /> • <br /> So, before you is the proposed request that the Planning Director has with his modifications. I <br /> tried to take out the Ramseyer version because it's quite cumbersome when you review a <br /> condition of the Ramseyer version. So, as you can see the Planning Director's proposed <br /> amendment to Condition E is that prior to receipt of Certificate of Occupancy the applicant shall <br /> 3 <br /> EXHIBIT B(DRAFT) <br />
The URL can be used to link to this page
Your browser does not support the video tag.