Laserfiche WebLink
provide a fire hydrant within 150 feet of the property and either upgrade the existing 4-inch <br /> water line to a 12-inch water line for a distance of approximately 800 feet or provide a private <br /> water system capable of providing a minimum flow of 2,000 gallons per minute for a 2 hour <br /> duration and a pipeline velocity of less than 10 feet per second or provide another method of fire <br /> protection as approved by the Fire Department. <br /> Now for Condition I. As you can see it's quite long. So, I'll try my best to summarize all of this. <br /> For Condition I the applicant again requested that the timing trigger be the final subdivision <br /> approval. As you can see on the left-hand side of your screen the Planning Director believes that <br /> the timing trigger for this condition should still be Certificate of Occupancy. However, we do <br /> recognize that currently on the parcel there is a solar panel PV as well as a shed that hasn't been <br /> built yet. So therefore, we are requesting that prior to Certificate of Occupancy for any new <br /> structure excluding structures that do not require a Certificate of Occupancy thus the storage <br /> building or a utility shed would not trigger this condition. Furthermore, if and when the property <br /> is subdivided and/or a CPR has occurred the road improvement requirements of the Subdivision <br /> Code would then be triggered. One of the things that the Planning Director is proposing right <br /> now is that we remove the specific wording of the standard details for Public Works <br /> Construction and replace it with the following language. Which would account for any possible <br /> changes that we may have to the public or standard details as well as the Subdivision Code <br /> which we know can change at any time and moment. <br /> So, you can see the changes that are being proposed are underlying on the slide to the left. I tried <br /> to take out some of the Ramseyer version again because it just seemed a little bit too much <br /> wording on one slide. This last slide shows you finally what the Planning Director has proposed <br /> for this condition and without any of the Ramseyer version on it. As you can see like we <br /> discussed, he is recommending that we put prior to receipt of Certificate of Occupancy for any <br /> new structures excluding structures not requiring a Certificate of Occupancy such as a storage <br /> and/or utility shed as well as the last statement which would still require the applicant to meet <br /> with the requirements of Chapter 23, of the Hawai`i County Subdivision Code at any time that <br /> they come in for a subdivision and/or a CPR of the subject property. <br /> So,that concludes my presentation, and I can turn the floor back to the Chair. <br /> GALIMBA: Thank you. Commissioners do you have any questions or clarification from the <br /> staff? If not, we will move on to the applicant we can always come back and ask questions. <br /> APPLICANT: Came up to the table. <br /> GALIMBA: Please raise your hands so I can swear you in. Do you swear or affirm to tell the <br /> truth on this matter now before the Windward Planning Commission? <br /> APPLICANT: Yes, I do. <br /> GALIMBA: Thank you. Please state your name and the town you live in and go ahead. <br /> FUKE: Sure. Good morning again this will be hopefully very brief. My name is Sidney Fuke- <br /> 4 <br /> EXHIBIT B (DRAFT) <br />