My WebLink
|
Help
|
About
|
Sign Out
Home
COM 0698.000 2022-2024
ClerkCouncil
>
Council Records
>
Communications
>
2022-2024
>
COM 0698.000 2022-2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2024 3:58:52 PM
Creation date
1/29/2024 1:41:42 PM
Metadata
Fields
Template:
Communications
Communications - Type
COM
Communications - Council Term
2022-2024
Communication
0698
Point
000
Author
Susan K. Kunz, Housing Administrator
Communications - Referred To
LAAC
Document Relationships
AGE COUNCIL 2024-02-21 2022-2024
(Related To)
Path:
\Council Records\Agendas\2022-2024\Council
AGE LAAC 2024/02/07 (2022-2024)
(Related)
Path:
\Council Records\Agendas\2022-2024\Legislative Approvals and Acquisitions Committee (LAAC)
REP LAAC 051 2024-02-07 2022-2024
(Related)
Path:
\Council Records\Reports\2022-2024\Legislative Approvals and Acquisitions Committee (LAAC)
RES 427 Draft 01 2022-2024
(Related To)
Path:
\Council Records\Resolutions\2022-2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
268
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I) Site Feasibility <br />Identify the existing use and disclose any potential problems associated with your proposed site. <br />For each of the four (4) categories (Access, Site Improvements, Topography and Soils, and <br />Environmental) describe any particular benefits of your site or disclose any known problems that <br />may be associated with your site. <br />Access to site: <br />Access to the site will be through an extension of Malulani Road from its current terminus near <br />the Lowes Home Improvement Center. <br />Site improvements and Current Use: <br />The site is currently vacant, unimproved land suitable for the development of housing. <br />Topography and soils <br />The project site slopes mauka to makai, but there is no presence of any excessive sloping that <br />would impede the development of the proposed project. The soils at the project site are <br />classified as Kainalu-Waiaha Complex, 10 to 20 percent slopes. These soils are comprised of <br />ash fields over a'a lava flows with profiles consisting of cobbly to very cobbly silt loam. The <br />soils are very well drained with low runoff, <br />Environmental Issues (Submit Exhibit 18.) <br />None noted. <br />Form 201H-001, 03/29/2023 Page 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.