My WebLink
|
Help
|
About
|
Sign Out
Home
COM 0698.000 2022-2024
ClerkCouncil
>
Council Records
>
Communications
>
2022-2024
>
COM 0698.000 2022-2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2024 3:58:52 PM
Creation date
1/29/2024 1:41:42 PM
Metadata
Fields
Template:
Communications
Communications - Type
COM
Communications - Council Term
2022-2024
Communication
0698
Point
000
Author
Susan K. Kunz, Housing Administrator
Communications - Referred To
LAAC
Document Relationships
AGE COUNCIL 2024-02-21 2022-2024
(Related To)
Path:
\Council Records\Agendas\2022-2024\Council
AGE LAAC 2024/02/07 (2022-2024)
(Related)
Path:
\Council Records\Agendas\2022-2024\Legislative Approvals and Acquisitions Committee (LAAC)
REP LAAC 051 2024-02-07 2022-2024
(Related)
Path:
\Council Records\Reports\2022-2024\Legislative Approvals and Acquisitions Committee (LAAC)
RES 427 Draft 01 2022-2024
(Related To)
Path:
\Council Records\Resolutions\2022-2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
268
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J) Availability of Utilities and Off -Site Improvements <br />For each of the seven (7) categories (Water, Sewer, Drainage, Roads, Electrical, Gas, Telephone/ <br />Television/ Data) describe the existing infrastructure capabilities and any planned or potential <br />expansion of infrastructure needed to develop this project. <br />Availability of Utilities <br />(Submit Exhibit 17) <br />Yes <br />No <br />Will the project utilize gas for cooking or water heating? <br />If yes, is gas service currently available to the site? <br />❑ <br />❑ <br />❑ <br />Will the project utilize solar water heating? <br />❑ <br />of water for the proposed project. However, water system improvements will be <br />Is electricity service currently available to the site? <br />® <br />❑ <br />Sewer/Septic service is currently available to the site for the number <br />and type of units proposed. <br />® <br />❑ <br />Water is currently available for the proposed number of units and type of units <br />for this project. <br />® <br />❑ <br />Does the site have a hook-up to telephone service? <br />® <br />❑ <br />Does the site have a hook-up to cable or internet service? <br />® <br />❑ <br />Are there any environmental concerns associated with site? <br />Is the project located on or near a Brownfield? <br />❑ <br />[] <br />Water j <br />Existing: <br />There is an existing 12 -inch water main stubbed out at Malulani Road, but the <br />proposed project site is above service limit elevation for this water system <br />Planned: <br />The County of Hawaii Department of Water Supply has informally committed units <br />of water for the proposed project. However, water system improvements will be <br />necessary to extend a new 12 -inch water main from the County water system <br />(with a higher service limit elevation) to the project site, and/or provide an onsite <br />water system with pump and reservoir to provide the adequate water pressure for the <br />proposed project. The cost of these improvements will be the responsibility of the <br />ro'ect elopers. <br />Form 201H-001, 03/29/2023 Page 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.