My WebLink
|
Help
|
About
|
Sign Out
Home
RES 542 Draft 01 2022-2024
ClerkCouncil
>
Council Records
>
Resolutions
>
2022-2024
>
RES 542 Draft 01 2022-2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2024 10:03:54 AM
Creation date
6/5/2024 1:05:23 PM
Metadata
Fields
Template:
Bill/Resolution
Bill/Resolution - Type
RES
Bill/Resolution - Council Term
2022-2024
Bill/Resolution
542
Draft
01
Introducer
Holeka Goro Inaba, Council Member
Referred To
COUNCIL
Action 1
Council: Adopts Res. 542-24 - 06/19/24
Status
Adopted
Date To Mayor or Adoption Date
6/19/2024
Reading Number
1
Reading Date
6/19/2024
Ayes
8-Evans, Galimba, Inaba, Kagiwada, Kānealiʻi-Kleinfelder, Kierkiewicz, Kimball, Lee Loy
Noes
0
Absent
1-Villegas
Excused
0
Document Relationships
AGE COUNCIL 2024-06-19 2022-2024
(Related To)
Path:
\Council Records\Agendas\2022-2024\Council
COM 0911.000 2022-2024
(Related)
Path:
\Council Records\Communications\2022-2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
149
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7. PROPOSED PROJECT <br /> a. Preliminary Project Design <br /> The proposed project consists of water lines,laterals, fire hydrants and associated appurtenances. <br /> The system will be designed to the County of Hawaii Department of Water Supply Standards <br /> and will be dedicated to the County upon completion. The water system will be constructed <br /> within existing roadways. Pavement restoration will be required across an entire lane width <br /> (minimum)in the location of the water line trench in Aniani Street and the full width of the <br /> travelled way(+/- 14')within Ild Place. The paving improvement will likely increase the <br /> volume of stormwater runoff generated within lid Place and it is recommended that a drainage <br /> inlet and seepage pit be installed at a low point within the ROW(as previously discussed in <br /> Section 5.f.V.)to dispose of this excess runoff and protect properties downstream. <br /> The work will generally include but not be limited to: <br /> — Hazardous tree removal <br /> — Utility pole bracing/replacement as necessary <br /> — Installation of a drainage inlet and seepage pit at low point within Iki Place <br /> — 1,150 linear feet of 8-inch ductile iron waterline <br /> — Two fire hydrants <br /> — Eight Type"B" service laterals <br /> — Two Type"A"service laterals <br /> — Miscellaneous valves and fittings <br /> — Demolition of existing service laterals and meter boxes • <br /> — Pavement restoration <br /> The new water system will be connected to an existing 8-inch waterline located within the <br /> Aniani Street ROW and extend a new 8-inch line to the end of l d Place. Water system utility <br /> easements will be granted to the Department of Water Supply over Iid Place. <br /> b. Project Schedule <br /> July 22,2022 -Application,PER and ER to USDA <br /> August 5,2022 -USDA RUS Loan/Grant obligation <br /> November 2022 -Land and Easement Acquisition <br /> January 2023 -Plans and Specifications, and Design Complete <br /> March 2023 -Bid Advertisement <br /> May 2023 -Bid Opening <br /> November 2023 -Notice of Award—Construction Contract <br /> January 2024 -Notice to Proceed—Construction <br /> June 2024 - Substantial Completion <br /> July 2024 -Final Completion <br /> I . <br /> 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.