Laserfiche WebLink
• <br /> c. Permit Requirements <br /> Permits for the proposed work will need to be sought from two government agencies;the State <br /> Department of Transportation(DOT)for minor work within Mamalahoa Highway, and the <br /> Hawaii County Department of Public Works—Engineering Division(DPW) for work within <br /> Aniani Street and Kona Church of God Road. <br /> The area of ground disturbance necessary to complete installation of the proposed water system <br /> is less than one acre and is therefore too small to require a National Pollutant Discharge <br /> Elimination System(NPDES) General Permit for Construction Activities. <br /> No portion of the project lies within any Special Management Areas (SMAs),therefore an SMA <br /> permit will not be required. <br /> d. Sustainability Requirements <br /> I. Improving the water service to the Iki Place subdivision by installing a county-dedicable <br /> water system will help to reduce and eliminate wasted water and the energy required to <br /> pump it from the ground to a usable elevation. <br /> II. Installation of wireless water meters which can be read remotely will lead to faster and <br /> more efficient system management and,reduced energy usage compared to the current <br /> water system.These meters would also reduce or eliminate the need for physical meter <br /> reading by a DWS employee and service vehicle. <br /> • 15 <br />