My WebLink
|
Help
|
About
|
Sign Out
Home
COM 0053.000 2024-2026
ClerkCouncil
>
Council Records
>
Communications
>
2024-2026
>
COM 0053.000 2024-2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2025 1:55:36 PM
Creation date
12/18/2024 11:10:27 AM
Metadata
Fields
Template:
Communications
Communications - Type
COM
Communications - Council Term
2024-2026
Communication
0053
Point
000
Author
C. Kimo Alameda, Ph.D., Mayor
Communications - Referred To
GOEAC
Comments
GOEAC-09: Recommended confirmation - 01/07/25 Council: Adopts GOEAC-09; confirmed the nomination of Hugh Y. Ono as Director of Public Works - 1/22/25
Document Relationships
AGE COUNCIL 2025-01-22 2024-2026
(Related To)
Path:
\Council Records\Agendas\2024-2026\Council
AGE GOEAC 2025-01-07 2024-2026
(Related)
Path:
\Council Records\Agendas\2024-2026\Governmental Operations and External Affairs Committee (GOEAC)
REP GOEAC 009 2025-01-07 2024-2026
(Related)
Path:
\Council Records\Reports\2024-2026\Governmental Operations and External Affairs Committee (GOEAC)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Underground Storage Tanks for both the State Highways and County of Hawaii on the Island of <br />Hawaii. Director. The implementation of above ground storage tanks to replace underground tanks. <br />Estimated construction cost not available. <br />Geographic Information System Services Experience Category (G04) <br />• None <br />Harbor and Waterfront Experience Category (H01) <br />• Wailoa River Bridge Replacement and Rehabilitation in Hilo Hawaii. Manager in Charge. <br />Underwater inspection and analysis of pile foundation and the replacement of existing bridge. <br />Estimated construction cost $9 million. <br />Highways & Roads Experience Category (H07) <br />• Queen Kaahumanu Highway in South Kohala and North Kona, Hawaii. Project Construction <br />Engineer. An 18 mile 2 lane highway providing a new route from Kawaihae to Kona. Estimated <br />construction cost $6 million. <br />H-3 Interstate Highway System on Oahu, Hawaii. Manager in charge. 11-mile freeway and tunnel <br />system. Estimated construction cost $1.5 billion. <br />• Maintenance Management Systems. Manager in charge. Put in place for both State Highways and <br />County of Hawaii Department of Public Works Divisions to include: Road Maintenance & Wastewater <br />Division. Estimated construction cost not available. <br />Hospital and Healthcare Experience Category (H09) <br />• None <br />Hotels Experience Category (H10) <br />• Ala Moana Hotel in Honolulu, Hawaii. Estimator and Quantity Take -off Engineer. 31-story hotel <br />complex in Waikiki. Estimated construction cost not available. <br />• Banyan Drive Project Task 1 - Determine Remaining Useful Life of Improvements, Hilo, Hawaii. <br />Principal. Provided engineering services that determined the Remaining Useful Life of three <br />properties on Banyan Drive. They included Reed's Bay Resort, Uncle Billy's Hilo Bay Hotel, and <br />Country Club Condominium/Hotel. The determination was based upon visual, non-destructive <br />observations, review of available documentation and interview with the property <br />managers/maintenance staff. The Remaining Useful Life Determination Report was provided to the <br />State of Hawaii, Department of Land and Natural Resources for their use in future planning efforts <br />regarding Banyan Drive. Estimated construction cost not available. <br />Industrial Experience Category (101) <br />• None <br />Irrigation, Drainage Experience Category (106) <br />• Waipio Valley Flood Damage Restoration Project in Hamakua, Hawaii. Project Manager. Recovery <br />of valley floor for 2 major storms and restoring of floodways to pre -flood conditions. Estimated <br />construction cost $1 million. <br />Laboratories, Medical Research Facilities Experience Category (L01) <br />0 None <br />
The URL can be used to link to this page
Your browser does not support the video tag.