Laserfiche WebLink
Land Development Experience Category (???) <br />• Oversaw County requirements for Development as Director of Public Works. <br />• Oversaw that Subdivision Processing and Approvals <br />Office Building Experience Category (001) <br />• None <br />Planning Experience Category (P05, P07) <br />• Public Works and State Highways. Director. Served as participant in development planning and <br />addressing infrastructure requirements to include traffic mitigation and impact analysis. Lead all <br />efforts to introduce, implement and execute all Infrastructure Improvements. <br />Postal Facilities Experience Category (P12) <br />• None <br />Power Generation, Transmission, Distribution Experience Category (P13) <br />• None <br />Public Safety Facilities Experience Category (P14) <br />• None <br />Rapid Transit Experience Category (11103) <br />• Zipper Lane in Honolulu, Hawaii. Introduced this concept to then State Administration, then lead the <br />team to implement and deliver this successful project. 6-mile long reversible contraflow lane using <br />moveable barrier system. Estimated construction cost $7 million. <br />Recreation Facilities Experience Category (R04) <br />• None <br />Rehabilitation Experience Category (11106) <br />• None <br />Security Systems Experience Category (S02) <br />• None <br />Seismic Designs & Studies Experience Category (S03) <br />+ Bridge & Viaduct Retrofit in State of Hawaii. Lead Manager. Design and Construction to increase <br />structural capacity of above ground structures to resist earthquake forces. Estimated construction <br />cost $20 million statewide. <br />Sewage Collection, Treatment & Disposal Experience Category (SO4) <br />• Hilo Wastewater Treatment Plant and Conveyance System in Hilo, Hawaii. Manager. New 5.0 MGD <br />plant, transmission and pumping stations to replace an obsolete facility. Estimated construction cost <br />$50 million. <br />