Laserfiche WebLink
Ms. Susan K. Kunz, Housing Administrator HWY-PL 24-2.35169 <br /> November 1,2024 <br /> Page 2 <br /> d. Project description, including pipeline and other infrastructure that may be removed <br /> or constructed within the HDOT right-of-way,operations and construction activities, <br /> hours of operation,and estimated number of vehicle trips to/from the site during <br /> peak traffic hours. <br /> e. Assessment of the project's potential direct,secondary,and cumulative impact to <br /> state roadways. <br /> If the qualitative traffic assessment suggests a potential for adverse impact to state <br /> highways,then the EA should include a Traffic Impact Assessment Report prepared by a <br /> licensed professional engineer. <br /> 3. Describe strategies to reduce carbon emissions from the project, if any. Suggestions <br /> include: <br /> a. Incorporate elements that encourage and enhance the use of multiple types of <br /> transportation to reduce carbon emissions. <br /> b. Implement energy-efficient technologies and practices,such as light-emitting diode <br /> lighting. <br /> c. Use sustainable, recycled,or low-emission materials in construction and <br /> manufacturing. <br /> If you have any questions,please contact Jeyan Thirugnanam, Land Use Planning Engineer, <br /> Planning Branch at(808)587-6336 or by email at jeyan.thirugnanam@hawaii.gov. Please <br /> reference file review number PL 2024-175. <br /> Sincerely, <br /> `"'" l <br /> LAWRENCE DILL <br /> Highways Administrator <br /> Attachment <br />