Laserfiche WebLink
Table 21-4. 2025 Mitigation Strategy <br />HC1 Civil Defense N/A This project involves In progress <br />the hardening of the <br />CounWs radio <br />communications <br />system through <br />replacement of the <br />following systems: <br />microwave system, <br />direct current power i <br />system, photovoltaic <br />energy systems; tower <br />refurbishment and the <br />acgaisitlon of cell-on- <br />1wheets capability. <br />KC2 Pollee Public Works This projectwill Unknown <br />eliminate flooding that <br />endangers the entire <br />electrical system at the <br />Public Safety complex <br />and causes damage in <br />otherareas. The <br />electrical system will <br />be upgraded to prevent <br />,failure. <br />Efforts have been Y MfA 111A <br />'completed to <br />integrate t <br />redundancies in the <br />communications <br />systems, Additional <br />work must be <br />completed to <br />harden the <br />Infrastructure. <br />{ <br />1 <br />Unknown at the - - <br />time of this plan. <br />N <br />TETRA TECH <br />21.24 2025 Hawaii County Hazard Mitigation Plan <br />