Laserfiche WebLink
27.Respondent's discharge of effluent from the Hilo, Papa'ikou and Kula'imano WWTPs in <br /> excess of one or more effluent limits contained'in these WWTP's NPDES Permits,as set forth in <br /> Paragraph 21, are not in compliance with permit part A.1 and violate section 301(a)of the CWA, <br /> 33 U.S.C. §§1311(a). <br /> 28.Respondent's systemic failure to properly operate and maintain all facilities and systems <br /> of treatment and control(and related appurtenances)which are installed or used by the <br /> Permittee to achieve compliance with the conditions of the NPDES Permits,as set forth in <br /> Paragraphs 22-23,violates"Standard NPDES Permit Conditions"Sections 8 and 9 of the NPDES <br /> Permits for the Hilo, Papa'ikou,and Kula'imano WWTPs. • <br /> 29. Respondent's discharges of pollutants.from its sewer collection systems to waters of the <br /> • United States, as set forth in Paragraph 24,were not authorized by an NPDES permit,and <br /> therefore violate CWA Section 301(a),33 U.S.C.§ 1311(a). <br /> 30. For the violations identified in this Section,the EPA is authorized to issue an order <br /> requiring compliance.CWA Section 309(a)(3),33.U.S.C.§1319(a)(3). <br /> V: ORDER FOR COMPLIANCE ON CONSENT <br /> • <br /> 31. Based on the foregoing Findings of Fact and Determinations of Law and pursuant to the <br /> authority of section 309(a)of the CWA,33 U.S.C. § 1319(a),IT IS HEREBY ORDERED and AGREED • <br /> that Respondent shall do the following: <br /> 32. Fully implement the actions specified in Appendix 1,in accordance with the schedule <br /> set forth in Appendix 1.Appendix 1 is incorporated herein by reference and is an enforceable <br /> provision of this Order. <br /> a. For each design,plan and evaluation in Appendix 1 that Respondent is required to <br /> submit to the EPA,the EPA will review the submittal to evaluate whetherthe <br /> requirements of this Order have been met.The EPA may also provide comments on <br /> the content of any submittal to assist Respondent in effectively achieving compliance <br /> with this Order. <br /> b. All final submittals specified in Appendix 1(including, but not limited to plans, <br /> programs,designs,assessments and schedules)shall be deemed incorporated into, <br /> and enforceable pursuant to,this Order. <br /> c. The schedule set forth in Appendix 1 assumes that the EPA and DOH will take thirty <br /> (30)calendar days to review each submittal.The EPA and DOH may take more than <br /> thirty calendar days to review certain submittals,in which case,the EPA will address <br /> . any adjustments to this review time,and the effect of any such adjustments on <br /> Respondent's subsequent due dates,on a case-by-case basis. <br /> d. Nothing in Section V or Appendix 1 waives,alters,or affects Respondent's obligations <br /> to timely take all measures necessary to address•any exceedance,equipment failure, <br /> or other event which causes,or threatens to cause,a CWA violation(including any <br /> In re County of Howai'i,Docket No.CWA-309(a)-24-003 Page 10 of 17 <br />