My WebLink
|
Help
|
About
|
Sign Out
Home
RES 592 Draft 01 2024-2026
ClerkCouncil
>
Council Records
>
Resolutions
>
2024-2026
>
RES 592 Draft 01 2024-2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2026 3:11:23 PM
Creation date
6/5/2026 3:51:01 PM
Metadata
Fields
Template:
Bill/Resolution
Bill/Resolution - Type
RES
Bill/Resolution - Council Term
2024-2026
Bill/Resolution
592
Draft
01
Introducer
Jennifer Kagiwada, Council Member
Referred To
GOEAC
Action 1
GOEAC-141: Recommended adoption - 06/16/26
Action 2
Council: Adopts Res. 592-26 & GOEAC-141 - 07/08/26
Reading Number
1
Reading Date
7/8/2026
Ayes
9-Galimba, Hustace, Inaba, Kagiwada, Kaneali'i-Kleinfelder, Kierkiewicz, Kimball, Onishi, and Villegas
Noes
0
Absent
0
Excused
0
Document Relationships
AGE COUNCIL 2026-07-08 2024-2026
(Related To)
Path:
\Council Records\Agendas\2024-2026\Council
AGE GOEAC 2026-06-16 2024-2026
(Original Version)
Path:
\Council Records\Agendas\2024-2026\Governmental Operations and External Affairs Committee (GOEAC)
COM 0935.000 2024-2026
(Related)
Path:
\Council Records\Communications\2024-2026
COM 0935.001 2024-2026
(Related)
Path:
\Council Records\Communications\2024-2026
COM 0935.002 2024-2026
(Related)
Path:
\Council Records\Communications\2024-2026
REP GOEAC 141 2026-06-16 2024-2026
(Related)
Path:
\Council Records\Reports\2024-2026\Governmental Operations and External Affairs Committee (GOEAC)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
replacement projects ranked as critical in the Final Priority Ranking.The <br /> implementation schedule will take into account the assessment of technical and <br /> fiscal feasibility based on the project designs and the Interim Fiscal Pllan for Critical <br /> Capital Improvement Projects. <br /> g. Annual Assessment and Report: The-COH shall conduct an annual assessment of <br /> the CIP to evaluate potential changes to the list of critical projects, <br /> implementation schedules,and technical scope.The COH shall produce an annual <br /> report on the status of the CIP list;including improvements,accomplishments, <br /> and future critical needs of the system.The COH shall provide the report in a <br /> standardized format to inform the public and decisionmakers of its operations. <br /> h. Interim Financial Plan for Critical Capital Improvement Projects:By June 30,2027, <br /> the COH shall develop and submit an Interim Financial Plan.The financial plan <br /> - shall include at a minimum(1)cost estimates for all Critical Capital Improvement <br /> Projects; (2)estimated annual budget(staffing,office space,vehicles,computers, <br /> etc.)for execution of the capital improvement projects;and(3)a detailed <br /> descriptive plan for raising sufficient revenue to meet the projected costs as <br /> outlined in the annual budgets,including adjustments to user fees,taxes, <br /> assessments,or other sources of revenue financing mechanisms. <br /> 9. County Integrated Wastewater Master Plan: By January 31,2027,the COH shall complete <br /> an Integrated Wastewater Master Plan that accounts for operation and maintenance of <br /> current wastewater infrastructure and future upgrades and expansions. The plan shall <br /> account for each COH wastewater treatment plant and associated collection systems,as <br /> well as planned expansions or new service areas.The purpose of the Wastewater Master <br /> Plan is to identify,prioritize,budget,and schedule the construction of CIP and repair, <br /> rehabilitation,or replacement projects needed to maintain and expand the COH • <br /> wastewater system,as well as project costs,staffing and other needs associated with <br /> operating the wastewater systems with a 20-year horizon.The Master Plan shall consist <br /> of the following components: <br /> a. WWTP Facility Plans:Develop or update plans for each wastewater treatment <br /> plant and associated collection systems(the"Facility Plans").The Facility Plans <br /> shall include a running list of CIP and repair,rehabilitation,or replacement <br /> projects needed to maintain and improve the wastewater system and include all <br /> projects not identified as"critical"in Section I,above.The CIPs identified shall be <br /> used to inform the Financial Plan required in Paragraph 10 of this Appendix <br /> (below).The planning document shall be completed for a 5-year,a 10-year,and a <br /> 20-year planning horizon. <br /> b. WWTP Operations and Maintenance Manuals:Update Operations and <br /> Maintenance(O&M) Manuals for all WWTPs.O&M Manuals should include <br /> staffing plans for each facility and for the greater wastewater program.The <br /> In re County of Hawaii, Docket No.CWA-309(a)-24-003:Appendix 1 Page 5 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.