My WebLink
|
Help
|
About
|
Sign Out
Home
RES 592 Draft 01 2024-2026
ClerkCouncil
>
Council Records
>
Resolutions
>
2024-2026
>
RES 592 Draft 01 2024-2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2026 3:11:23 PM
Creation date
6/5/2026 3:51:01 PM
Metadata
Fields
Template:
Bill/Resolution
Bill/Resolution - Type
RES
Bill/Resolution - Council Term
2024-2026
Bill/Resolution
592
Draft
01
Introducer
Jennifer Kagiwada, Council Member
Referred To
GOEAC
Action 1
GOEAC-141: Recommended adoption - 06/16/26
Action 2
Council: Adopts Res. 592-26 & GOEAC-141 - 07/08/26
Reading Number
1
Reading Date
7/8/2026
Ayes
9-Galimba, Hustace, Inaba, Kagiwada, Kaneali'i-Kleinfelder, Kierkiewicz, Kimball, Onishi, and Villegas
Noes
0
Absent
0
Excused
0
Document Relationships
AGE COUNCIL 2026-07-08 2024-2026
(Related To)
Path:
\Council Records\Agendas\2024-2026\Council
AGE GOEAC 2026-06-16 2024-2026
(Original Version)
Path:
\Council Records\Agendas\2024-2026\Governmental Operations and External Affairs Committee (GOEAC)
COM 0935.000 2024-2026
(Related)
Path:
\Council Records\Communications\2024-2026
COM 0935.001 2024-2026
(Related)
Path:
\Council Records\Communications\2024-2026
COM 0935.002 2024-2026
(Related)
Path:
\Council Records\Communications\2024-2026
REP GOEAC 141 2026-06-16 2024-2026
(Related)
Path:
\Council Records\Reports\2024-2026\Governmental Operations and External Affairs Committee (GOEAC)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> staffing plans must include,at a minimum:(1)Identification of adequate staffing <br /> levels;12)summary of budget needs for the program (3) identification of training <br /> needs for Operators and staff;and(4)identification for adequate funding to <br /> support program.Staffing required for proper O&M of all WWTPs should be • <br /> budgeted for in the fiscal year after th'e County-wide Master Plan is completed. <br /> c. SPS Operations and Maintenance Manuals:Update O&M Manuals for all Sewage <br /> Pumping Stations(SPS)that include staffing plans similar to the WWTP O&M <br /> • <br /> Manuals. • <br /> • <br /> d. Cesspool Conversion Master Plan. The Cesspool Conversion Plan shall include the <br /> following components: Perform desktop analysis of cesspool areas;conduct <br /> • community engagement and education;development of a Financial and Funding . <br /> Plan;and Development of the Cesspool Conversion Plan <br /> e. Regional Plans for Puna, Puako,South Kohala,and Pahoa. <br /> • <br /> f. Wastewater Sewer Service Connection Expansion Program: By December 31, <br /> 2026,the COH shall develop a Wastewater Sewer Service Connection Expansion <br /> Program to promote environmental compliance,cesspool conversion,efficiency of <br /> operations,and revenue generation. <br /> • i. The COH shall establish sewer service areas for each of its wastewater <br /> treatment plants. <br /> ii. Within 9 months of the effective date,the respondent shall develop a <br /> program to verify existing connections within the service areas and <br /> identify parcels that need to be connected to the existing PQTW and <br /> where collection system expansion is appropriate. <br /> iii. . The COH shall modify the county code to require all newdevelopment <br /> within service areas to connect to the POTW. <br /> • <br /> iv. The COH shall modify the county code to require all parcels within <br /> service areas to connect to the POTW by the cesspool conversion date: <br /> v. The COH shall produce a policy/procedure/rule requiring future rate <br /> studies and facility plans include POTW expansion evaluations,and that <br /> those expansions are programmed into the division budget through the <br /> financial plan and CIP program. <br /> g. Organizational Chart:The COH shall submit an Organizational Chart that shows <br /> the staffing needed to perform-the planning and engineering effort required <br /> under the EPA Order. <br /> In re County of Hawai'i,Docket No.CWA-309(a)-24-003:Appendix 1 Page 6 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.