Laserfiche WebLink
9. ROUTE 132 (OLD KEAAU - PAHOA ROAD) PAVED WALKWAY <br />Construction 20 <br />Total 20 <br />10. PECK ROAD IMPROVEMENTS <br />Construction 100 <br />Total 100 <br />11. KEOPU FLOOD CONTROL CHANNEL IMPROVEMENTS <br />Land Aquisition 200 <br />Design/Survey 250 <br />Total 450 <br />12. PALANI ROAD SAFETY IMPROVEMENTS <br />Design/Survey 150 <br />Total 150 <br />13. WAIMEA TRAFFIC IMPROVEMENTS <br />Construction 350 <br />Total 350 <br />14. KAUMANA GARDENS SEWER <br />Construction 4,000 <br />Total 4,000 <br />15. AINAKO-AINA NANI SEWER <br />Design/Survey 300 <br />Total 300 <br />16. PUUEO COLLECTOR SEWER <br />Design/Survey 100 <br />Total 100 <br />