Laserfiche WebLink
<br /> 2 To provide swell-manicured playing surtace at all balifields (Wong Stadwm and <br /> Walter Victor Complex) <br /> a Mow lawn weekly, weather permitting <br /> Firot quarter 12 weeks (1 rafnout) <br /> Second quarter 11 weeks (2 roinouts) <br /> Third quarter through 2/28101 8 weeks <br /> b Close each ballfield at least one week annually for field renovations <br /> Each ballfield was closed during baseball off-season (Oct.-Dec.) for field <br /> renovations. <br /> <br /> 3 To provde training for staff. <br /> a Conduct safety talks on different topics once a month. <br /> Since July 1st we have had five meetings with staff concerning safety <br /> issues through 2/28101. We will work wlth current Department Safety <br /> Committee about safety topics for staff. The Safety Committee has <br /> Implemented a form that Ilsts some current injuries and ways on how to <br /> prevent each injury. We will use this for discussion at our staff meetings <br /> for safety and how to prevent Injuries. <br /> b Retrain employees on egwpment use semi-annually. <br /> Supervlsoro had retraining done with employees during the flrot half of <br /> this fiscal year, and will do another rofresher training in April. We had <br /> Allied Machinery come in and do a workshop on operating and <br /> maintaining the Grasshopper riding mower and deck. <br /> c Have supervisors conduct egwpment maintenance training, and have <br /> equipment maintained weekly. <br /> Supervisoro conducted training during the first two quartero and rotate <br /> equipment maintenance weekly. When we obtain enough equipment for <br /> each facility, employees assigned to that facility should be responsible for <br /> maintaining equipment assigned to them. <br /> d Provide refresher course on Material Safety Data Sheet annually <br /> We did a refresher course on the MSDS folder in January, going over <br /> location of folder, master Ilst of chemicals and safety precautions to <br /> prevent Injuries. <br /> <br />