Laserfiche WebLink
<br /> The GP must either show build-out of permitted land use or show how the development <br /> rights will be withdrawn. <br /> • The Planning Director has verbally committed to making this basic change. <br /> II. Apply the County's own Land Zoning Bank policy for projecting future subdivision <br /> and zoning needs where the eusting inventory of buildable parcels is insufficient for the <br /> nett five to ten years, based on actual use as descnbed in paragraph 1. <br /> • The Land Zoning Bank is a prescribed paR of community development plans. [ts <br /> <br /> funCLOn is to inventory the available vacant land in each zoning classification and then <br /> determine if there is sufficient available land to meet the development needs for the nett <br /> S 10 years. Only if there is insufficient vacant land in a given zoning classification does <br /> the Land Zomng Bank allocate a "fund" of "zoning acres" that may be drawn upon to <br /> itpzone in that area. if there is ample vacant inventory, no rezoning should occur. This <br /> function, if it is to function at all, must be reflected in the GP. The County end the State <br /> (in their Boundary analyses), have both made a mockery of this principle by assuming <br /> that, for instance in Puna, 16,000 parcels, each one-half-acre or less in size, do not count <br /> as existing inventory of bmldable residential parcels because they are zoned for <br /> agriculture. Additional residential subdivisions are thereby justified. <br /> 111. The GP must plan locations of parks, fire stations, police stations, stores and other <br /> daily commerce, employment, waste disposal, public water, utility systems and <br /> transportation links for all anticipated development shown as a result of compliance with <br /> I and II. The County must require the State to provide, for the GP, all the schools, state <br /> parks and other state facilities. <br /> ~y9 <br /> • HRS Chapter 226 and the function of planning require this. Planning accomplishes the <br /> purpose of health, safety, and management of the public purse by anticipating needs in <br /> time to make arrangements for them at the lowest possible public cost. Waiting to <br /> identify needed public lands until pnvate property must be condemned is contradictory to <br /> the function of planning. <br /> • It is not fair to property owners for them to have to invest in their private property <br /> while the threat constantly hangs over them of condemnation for public use. This threat <br /> occurs when government creates development rights that will require public <br /> infrastructure and services, but fails to plan for those public land needs. <br /> IV. Provide within the GP review a process for all communities to choose between two <br /> d4fferent development styles: suburban sprawl or compact "livable" communities. <br /> Provide realistic descriptions of the two options: including infrastructure, environmental <br /> <br />