Laserfiche WebLink
Ltr. to Honorable James Y. Arakaki <br /> Page 2 <br /> September 27, 2001 <br /> • The construction of the connector road shall be completed within eighteen (18) months of <br /> the DPW's determination that the Road A/Volcano Highway/Keaau Bypass intersection <br /> is being adversely impacted. <br /> The DPW is also requesting that Condition M of Bill No. 195, Draft 4 be amended to require that <br /> the design of the connector road between the proposed Keaau Gateway Center and Keaau <br /> Village is completed within one year from Final Subdivision Approval of the Keaau Gateway <br /> Center area. The current requirement allows two years for the completion of the design. This <br /> will assure that the connector road alignment is set and the design completed on a timely manner. <br /> This will further provide additional assurance that this connector road shall be completed. <br /> Please find attached a copy of the proposed amendments to Conditions M and N in a Ramseyer <br /> format showing proposed amendments from Draft 4. <br /> Should the Council decide to accept these proposed amendments, the Mayor will support the <br /> adoption of Bill 195, which will rezone the proposed Keaau Gateway Center project area from <br /> Agricultural to Mix Use Commercial-Industrial. <br /> Thank you for your patience on this matter. We believe that the time taken to ensure that the <br /> Mayor's concerns have been addressed will result in a better development for this region of the <br /> County. <br /> I.~ 1C • W . oCsw <br /> <br /> DENNIS K. W. LEE, P. E. <br /> <br /> Director <br /> <br /> cc: Mayor Harry Kim <br /> <br />