Laserfiche WebLink
W.H. Shipman, Ltd. <br /> Keaau Gateway Project <br /> Summary of Conditions of Approval <br /> <br /> Bill No. 195, Draft 5 <br /> No. Bell 195 Drift 4 Big! 195 1)r~fft 5 <br /> K Requires the construction of a connector road between No Change <br /> Shipman Business Park and Project Area prior to <br /> occupany <br /> Further provides that the effective date of the rezoning <br /> shall be upon. either bonding or construction of the <br /> Stage 1 improvements. <br /> L Requires the constnuction of an pedestrian bike path No Change <br /> M Requires the construction of a connector road from the No Change except to require that the design of Connector <br /> Project Area to the Keaau Pahoa Road intersection. Road 2 be completed within 1 year rather than ;~u 2 years. <br /> Requires that final design of the road shall be bonded <br /> as part of final subdivision approval for any portion of <br /> Phase I and shall be completed within 2-year <br /> thereafter. <br /> Stage I improvements, which consist of a <br /> travelway, shall be wmpletrd prior to occupancy <br /> of any developmerst within the Keaau Gateway <br /> Phase II area. State 2 irnproremer.*s, which <br /> consist of upgrading the road to dedicable <br /> standards, shall bs completed concurrently with <br /> any de.•elopment immediately fronting the <br /> Connector Road 2. <br /> Requires that the applicant shall record a covenant <br /> requiring thp construction of Connector Road 2 in <br /> accordance vrith this conditiar. <br /> N Provides if Lhe County determines that the Deletes the provision that allows the County to improve <br /> Construction of Connector Roads 1 and 2 is required Connector Roads 1 and 2 and that the applicarrt usdicate <br /> prior to the schedule provided under the conditions, the right-of--way to the County upon its request. <br /> the County may improve the roads at its own cost. In <br /> this: event, the applicant shall dedicate the road right- Adds provision that establishes that DPW can require the <br /> of--way at no cost to the County upon its request. applicant to construction Connector Road 2 upon. <br /> determination that the Road A/Volcar:o HighwayfKeaau <br /> Bypass inrtersection is being adversely impacted.. It further <br /> requires that the construction of Connector Road 2 be <br /> completed within 18 months of DPW's notice to proceed. <br /> Further requires that the applicant shall provide a bond or <br /> other financial assurance for the construction of Connector <br /> Road 2 improvements prior to occupancy of any. portion of <br /> the Project Area. <br /> O Requires drainage study No Change <br /> P Requires developmerrt of Solid Waste Management No Change <br /> Plan. <br /> _ _ <br /> Q Requires provision of wastewater system. No Change <br /> R Requires compliance w?..#a all applicable rules, No Change <br /> regulations and requirements. <br /> S Req:.~ires the submiUtal of an annual status report. No Change <br /> T Provides for an initial time extension No Change <br /> U Provides that area may be rezoned for non-compliance No Change <br /> with conditions of approve! <br /> <br />