Laserfiche WebLink
MRY-16-97 FRI 15.09 MB-WCFO FAX ^!0. 510975D381 P. 07 <br /> <br /> 30.36(c) 3036(0 <br /> PART 30 • RULES OF G~r.cRAL APPLICABILITY TO DOMESTIC ~tCENSING-• <br /> I byproduct material until the (eJ Coincident with the moti5canon and these procedures could increase <br /> Commission notifies the licensee in required by paragraph (d) of this potential health and safely impacts to <br /> writing that the license is terminated. sectron, the rcensea shall maintnia in workers or to the public. such as in any <br /> During this time, the licensee shall- effect all decommissioning financal of the following cases: <br /> $ (1) Limit actions involving byproduct assurances established by the licensee (i) Procedures would involve <br /> material to those related to pursuant to § 30.35 in coniunttton with terlrniques not applied routinely during <br /> a decommissioning: and a license issuance ar renewal or as cleanup or maintenance operations: <br /> ~ (2) Continue to cgntrol entry to required by this section. The amount of (iip Workers would be enterimg areas <br /> estricted areas un[il they are suitable the Rnancial assurance must be not normally otxupied whore surface <br /> for release in accordance with NRC increased. or may be decreased, ss contamination and radiation levels are <br /> repuirements. appropriate, to rnver the detailed cost significantly higher than routinely <br /> estimate for derar[mdssioning encountered during opere~ion; <br /> established pursuant to paragraph ~ (iii) Procedures could result in <br /> (dl Within 60 days of the occurrence (g)(4j(vj otthis section. ~ significantly greater airboma <br /> (i) Any licensee who has not x concentrations of mdioauive materials <br /> of any of the following, consistent with provided financial assurance [o cover c .than are present dutin operation: or <br /> the administrative diramionc in § 30.8. <br /> each licensee shall provide notification the detailed cost estimate subrnitlnd 'o (iv) Procedures eoul result in <br /> ro the NRC in writing of such with the decommissioning plan shell do signifirantly greater releases of <br /> occurrence. and either begin so When this rule becomes affective radioactive materiel to the environment <br /> decommissioning its site, or any November 29:, 3995. than those associated with operation. <br /> separate building or outdoor area that (2) Following approval of the (2) The t:ommlsslon may approve an <br /> decemmissioning plan, a licensee may alternate schedule fot submittal o[ a <br /> Q wntains residual radioactivity so that ~ reduce the amount of rho financial decommissioning plan required <br /> a the building or outdoor area is suitable ~ assurance as.decommissioning protesds pursuant to paragraph (d) of this section <br /> m for release in accordance with NRC ~ end radiological mntamiaetion is it the Commission determines that the <br /> requirements, or submit within 12 o reduced at the site with the approval of ahernauve schedule is necessary to the <br /> months of notification a t° the Commission. affective wnduet of dewmmissiening <br /> decommissioning plan, if required by opera[ions and pressnls no undue risk <br /> paragraph (g)(1) of this section, and from radiation to the public health and <br /> begin decommissioning upon approval safety end is otherwise In the public <br /> of that plan if- interest. <br /> (1) The Commission may gran[ a <br /> (t) The license has a rred ursuant request ro extend the time periods <br /> to y~ragraph (a) or (bl off <br /> this spectfan: or established in paragraph (d) it the <br /> (z) The licensee has derided to Commission determines that this relief <br /> permanently cease principal activities, is not detrimental to the public health <br /> as defined in this part, et the entire site and safety and is otherwise in the public <br /> or in any separate building or outdoor interest. The request must be submitted <br /> area that comains rosidue] radioactivity no later sham 30 days before notification <br /> m such that the building or outdoor area pursuant to pamgtaph (d) of this <br /> g is unsuitable for release in accordance section. The schedule for <br /> with NRC requirements; or decommissioning set forth in pamgraph <br /> ~ (3) No pnncrpal activities under the fd) of this section may not wrnmtmce <br /> v°', license have bean ronduned fora until the Commission'hes made a <br /> period of 29 months: or determination on the regtrest. <br /> (9) No principal activities have been (g)(1) A decommissioning plan must <br /> conducted for a period of 24 months in be submitted if required by license <br /> any separate building or outdoor area condition or if the procedures and <br /> that contains residual radioactivity such activities necessary to mrty out <br /> that the building or outdoor area is decommissioning ofthe site or separate <br /> unsuitable for release in accordance building or wldoor area have not been <br /> with NRC roquicamenl6. Previously approved by the Commission <br /> T <br /> June 28, 1996 30-16 <br /> <br />