My WebLink
|
Help
|
About
|
Sign Out
Home
COM 0212.400 1996-1998
ClerkCouncil
>
Council Records
>
Communications
>
1996-1998
>
COM 0212.400 1996-1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2017 11:56:54 AM
Creation date
5/10/2008 7:46:52 PM
Metadata
Fields
Template:
Communications
Communications - Type
COM
Communications - Council Term
1996-1998
Communication
0212
Point
400
Author
Margarita Hopkins, Economic Development Specialist, Department of Research and Development
Communications - Referred To
Council
Comments
Presented: Council - 5/19/97
Communications - File Code
FND/CIP
Document Relationships
AGE COUNCIL 05/20/1997 1996-1998
(Related)
Path:
\Council Records\Agendas\1996-1998\Council
COM 0212.000 1996-1998
(Related)
Path:
\Council Records\Communications\1996-1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> MAY-16-97 FRI 15;10 MB-WCFO FAH N0, 5109750381 P, 08 <br /> 3036(g) 3036(j) <br /> PART 30 . RULE.. JF GENERAL APPLICABILITY TO DOn.cSTIC LICENSING••• <br /> •~1 ~(3) Procedures such as those listed in ~(h)(1) Sxvapt as prov~dtd in paragraph (i) The Commission may approve a <br /> rparagraph (g)(1) of this section with (i) of this section, licensees shall request for nn alternative schedule for <br /> m potential health and safety impacts may complett decommissionng of she site completion of decommissioning o(the <br /> ~ no[ be carried ou[ prior to approval of or separate building or outdoor area site or separate building or outdoor area. <br /> s the decommissioning plan. ,n as soon as practicable but no lster and license termination it appropriate, if <br /> w ~ than 24 months following the initiation the Commission determines that the <br /> ~ N of decommissioning, alternative is warranted by <br /> L ~ (2) Except as provided in paragraph consideretion of the following: <br /> (i) of this section, when (i) Whether it fs technically feasible <br /> decommissioning involves the entire to complete decommissioning within <br /> site, the licensee shall request licehse the allotted 2a-month period; <br /> termination as soon as practicable but (2) Whether sufficlent waste disposal <br /> (4) The proposed decommissioning no later than 24 months following the capacity is available to allow <br /> plan for the site or separate building or initiation of decommissioning. completion of dacommisstoning within <br /> outdoor area must include: the allotted 24•month atiod; <br /> li) A description of the conditions of (3) Whether a signifpwat volume <br /> the silo or separate building or otttdoer reduction in wastes requiring disposal <br /> area sufficient to evaluate the will be achieved by allowing short-lived <br /> acreplability of the plan; radionuclides to decay; <br /> (ii) A description of planned (4) Whether a signi6caat reduction in <br /> ~ decommissioning activities; radiation a:postue to workers can be <br /> tv (iii) A description ofmethods used to achieved by allowing short-lived. <br /> ~ ensure protection of workers and the R <br /> LL environment against radiation hazards m radionuclides to datay;and <br /> m during decnmmissioni ¢ (5) Other sits-spad5c [atxors which <br /> the Commission may consider <br /> (iv) A desviplion of a planned final °m appropriate on a case-by-case basis,. <br /> rodiation survey; and such ea the regulatory requirements of <br /> (v) An updated detailed cost estimate other government agencies, lawsuits, <br /> for decommissioning, nomp~rison of groundwater treatment ectivi[iss. <br /> that estimate with present funds set monitdred natural grotmd-water <br /> aside for decommissioning, and a plan restoration, actions that could result in <br /> for assuring the avallabillty of adequate more environmental harm than deferred <br /> funds for completion of cleanup, and otlrer factors beyond the <br /> } decommiuionmg. control of the licensee. <br /> (J) As the final step in <br /> decommissioning. the licensee shall- <br /> ~~(vi) For decommissioning plans licensed mater al. i cludin of all <br /> IfIII calling for completion of g <br /> ~ decommissioning later [hen 24 months accumulated wastes. by submitting a <br /> N after plan approval, the plan shall completed NIRC Form 314 or equivalent <br /> ¢ include a justiflt:atlon foe the delay information: and <br /> t` based on the criteria in pangnph (i) (2) Conduct s radiation survey of the <br /> Lef this section. premises when the Ifcensed atxivities <br /> were carried out and submit a repoR of <br /> the results of this survey unless the <br /> licensee demonstrates thei the pttrmises <br /> are suitable For release in some other <br /> (s) The proposed decommissioning manner. The licensee shall, as <br /> plan will be approved by the appropriate-- <br /> ~ Commission if the information therein rl Repoli levels of gamma radiation in <br /> m demonstrates that the derpmmisaiont-., units of millisievens (microroenrgen) <br /> ¢ will ve completed u coon as practlnble <br /> " and the[ the health and safely of <br /> ~ workers end the public will be <br /> Ladequa[ely proteeeed. <br /> j <br /> 30-17 June 28, 1996 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.