My WebLink
|
Help
|
About
|
Sign Out
Home
COM 0493.088 2000-2002
ClerkCouncil
>
Council Records
>
Communications
>
2000-2002
>
COM 0493.088 2000-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2019 10:19:43 AM
Creation date
5/10/2008 2:59:59 PM
Metadata
Fields
Template:
Communications
Communications - Type
COM
Communications - Council Term
2000-2002
Communication
0493
Point
088
Author
Michael J. Matsukawa, Attorney at Law
Communications - Referred To
PC
Comments
PC-Close File - 10/08/02
Communications - File Code
PLG
Document Relationships
AGE PC 10/08/2002 2000-2002
(Related)
Path:
\Council Records\Agendas\2000-2002\Planning Committee (PC)
BIL 163 Draft 01 2000-2002
(Related To)
Path:
\Council Records\Bills\2000-2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
[1 <br />Warren H. W. Lee, P.E. <br />Pvesfdent <br />The Honorable Keith W. Ahue <br />Chairman of the Board <br />Department of Land and <br />Natural Resources <br />State of Hawaii <br />130 Kalanimoku Building <br />Honolulu, HI 96813 <br />Dear Mr. Ahue: <br />Hawaii Electric Light Corr v, Inc. • PO Box 1027 • Milo, HI 96721-1027 <br />December 8, 1993 <br />I am writing about your September 20, 1993, letter in which you comment on <br />the Revised Draft Environmental Impact Statement for the Keahole Generating Station <br />unit addition. <br />Hawaii Electric Light Company's consultant for the EIS, CH2M HILL, will be <br />preparing a separate response to your comment letter. We believe our Revised Final <br />EIS (EIS) and the responses to the comments on the Revised Draft will fully satisfy all <br />legal requirements for your acceptance of our EIS. <br />Acceptance of our EIS is a very important initial step towards satisfying the <br />Island of Hawaii's 1995 electrical needs. Your acceptance is urgently needed in order <br />to prevent rolling blackouts on the Big Island resulting from delays in completing <br />future generating units when they are required. Your acceptance of our EIS and the <br />Land Board's approval of our CDUP amendment, are two of the very significant <br />approvals needed before we can proceed with the expansion of our existing Keahole <br />generation plant. <br />We need to have the next generating unit completed in mid-1995 when <br />additional generation will be necessary. Uo other viable site has been proposed for <br />new generating capacity in 1995, and the earliest date for which an independent <br />power producer (IPP) has proposed new generating capacity is at the end of 1996 or <br />later. We note that, very recently, an IPP proposing to build a 58 MW power plant on <br />Department of Hawaiian Home Lands property near Kawaihae Harbor received a <br />negative declaration for its EIS. Nevertheless, the IPP does not expect to have its <br />generation unit completed until late 1996 or later. <br />EX 181`91-A--.. <br />a <br />I FI Comoanv <br />
The URL can be used to link to this page
Your browser does not support the video tag.