Laserfiche WebLink
Honorable James Y. Arakaki, Chairman <br /> and Members of the County Council <br /> <br /> Page 5 <br /> All utilities and services are or will be made available to the project site which <br /> are essential to accommodate urban development. The principal access to the proposed <br /> development would be provided from the Kanoelehua Avenue, which is under the <br /> jurisdiction of the State Department of Transportation -Highways Division. The State <br /> has informed us that the Kanoelehua Widening project will add an additional outbound <br /> lane with concrete curbs and sidewalks fronting the subject parcel. This project is <br /> scheduled to be advertised for bids within the next couple of months. The applicant <br /> would be required to comply and meet with all applicable requirements of the <br /> Department of Transportation -Highways Division, including construction of driveway <br /> access and the construction of all sidewalk areas affected by the driveway access. In <br /> addition, the applicant shall comply with all applicable Department of Public Works <br /> requirements, including wastewater disposal and solid waste management. The <br /> Department of Water Supply stated that water would be available from an existing <br /> 12-inch waterline along Kanoelehua Avenue by constructing necessary water <br /> improvements. As a result of new roadway improvements and based on the fact that <br /> the existing business is within a half mile of the new location, it is not anticipated that <br /> the proposed relocation of the business will create a significant increase in traffic in the <br /> area. All other utilities and services are available to the subject property. <br /> The project area has no severe geological or topographical problems which <br /> cannot be properly rectified or which would render the land unusable. The subject <br /> property is relatively level. According to [he Flood Insurance Rate Map (FIRM), the <br /> project area is within Zone X, an area determined to be outside the 500-year flood <br /> plain. The project area is also located outside of any tsunami inundation area. Any <br /> new construction or improvements to the project area must comply with Chapter 27 of <br /> the County Code relating to Flood Hazard Control. The subject property has been <br /> developed and therefore, no endangered or threatened species of floral or fauna nor any <br /> archaeological sites are anticipated to be found on the subject property. <br /> Finally, as there are existing single family residences adjacent to the subject <br /> area. To mitigate any potential noise and visual impacts, it is recommended that a <br /> landscaping buffer, to be determined during plan approval review, be established along <br /> side property boundaries. <br /> Based on the above findings, this request for a Change of Zone from a Single <br /> Family Residential (RS-10) to a Light Industrial (ML-20) would result in an <br /> appropriate land use pattern and further the convenience, necessity and general welfare <br /> of the public. <br /> <br />