Laserfiche WebLink
Christopher Yuen <br /> Page 2 <br /> April 30, 2004 <br /> aligning to approximate)} Sa acres of undeveloped properties owned under Bolton and CL&.D Six, LLC. The <br /> General Plan includes the Hienaloli-Kahalui road project as a connector from Palani Road to Hualalai Road, but it <br /> is still at the conceptual stage. The most recent official comment. Nm ember 2002, declared the project in need <br /> of additional evaluacon -there is current County confirmation that the project status has not changed and is still in <br /> need of additional evaluation. An actual solution to same of the Kailua-Kona congestion and overburdened Nani <br /> Kailua Driv e/Queen Ka'ahumanu Highway intersection would be to develop the road from [he proposed <br /> subdivision northbound to Palani Road -but that is not under consideration. There has been no environmental <br /> assessment or any other evaluation for the Hienaloli-Kahalui connector road project, north or south of the proposed <br /> subdivision: therefore, the applicant's connector road development proposal is not a valid considemtion. <br /> The Hienaloli Dminagevr'ac has had flooding problems in the past, and currently (with the recent rains) there has <br /> been a significant increase in water flow through the drainageway area. The developer has obtained a revised map <br /> from FEMA. Consideration of the U.S. Army Corps of Engineers Keopu-Hienaloli Feasibility Study is also <br /> necessary. The Stud} commenced in 2002 and is scheduled for completion sometime azoand Mazch of 2006 (2nd <br /> Qtr Federal FY2005). The Cotmty has committed Deer $500,000 in tax payer monies to [his sturh. which will <br /> ulcmateh close off the North Keopu Stream and divert that flow to the South Keopu Stream. which is part of the <br /> Keopu-Hienaloli watershed system and is bound to effect the Hienaloli Drainageway flood area. There has been no <br /> comment solicited from this federal agency to determine the effects of subdivision development on the flood control <br /> project. or to determine the effects of the altered stream system on the proposed subdivision. <br /> On the Connty level, the application for [he proposed subdivision includes a facomble recommendation from <br /> Planning Department although agency comments have expressed a number of reseryacons about the projeM. The <br /> County Planning Commission and the County Planning Committee have both provided negative recommendations. <br /> [t is appropriate to refer the approval process to the Land Use Commission to review the agency comments under <br /> the stricter criteria required for development approvals. <br /> One justification for the State LUC approval is that the actual land azea in question is over li-acres. <br /> While I appreciate your acknowledgement that Lots 1 and 6 may share common owners. you may have dismissed <br /> the main premise of the segmentation conclusion: the same owner has interest on all six lots, in cooperation with <br /> business associates as indicated by property transactions, in spite of the applicant's representative Apri12t1th "deny. <br /> deny, den" tactics. Since no activity has ye[ occurred on Lot 2. the relevance to development on that lot is limited <br /> to future accvih, which, according to Mr. Mocers, is inevitable. The Lot 2 ownership interest is evenly divided <br /> between [he Robert D. Triantos trust members: Robert D. Triantos. William L. Wong, and Gmnt Miller. Lot 3 <br /> currently has submitted the SLU Od-006/REZ O I-009 applications for a change from A-5a to RS-20. which will <br /> add another 12 homes in the same section. Lot 3 is listed under Gmjan Wilkemob Project. LLC, and the president <br /> and corporate agent of that compam's manager, WLW Development Methods. Inc., is William L. Wong. As a <br /> point of reference. both lots have ownership under the member names of the Robert D. Triantos Tnut. <br /> The common ownership of Lots 1 and 6 helps to illusvate the point I have attempted to make. The CL&D LLC <br /> entices are all manager-managed companies under the sole management of Nani Kona Aina LLC. as you no doubt <br /> have recognized. Nani Kona Aina, LLC is amember-managed compan}• whose sole member is Dan Bolton, and <br /> <br /> whose publicly listed corporate agent is Robert D. Triantos, of Carlsmith Ball. LLP. <br /> Your letter states that you have no information showing that the Weltons are involved in the ownership of any <br /> other lot than lot 1. That observacon, whatever the Wel[on's involvement may be, misses the point. Your letter <br /> mentions boundary adjustments as "the kind of thing that can occur between independent but cooperacng <br /> landowners." The boundary adjustment between Lot ~ and Lot which is interesting without an ownership <br /> transfer transaction, indicates a cooperative interest in the property development designated in the applications <br /> (SLU 02-007/REZ 02.017) submitted for TMK 7-~-I0:052. <br /> <br />