Table 6 Lapse Report
<br />AcctNo_Aoencv
<br />ProiectTitle
<br />Ds sition
<br />Desi
<br />CrdNo LapseDate,
<br />FundSource
<br />AoornAmt Allotment UnexcendAll� Status-
<br />ated/Exoended
<br />Puueo Collector Sewer
<br />Lapse
<br />1 Contact collector sewer
<br />01-56;6/3012004
<br />_
<br />SRF
<br />2,000,000
<br />,69135; DEM
<br />_
<br />5292.30 DPW
<br />Palai Stream Flood Control (ACOE)
<br />In progress_
<br />_Feasibility study ACOE _ _
<br />_ 01-56 613012004
<br />_Any/2001A/2003A
<br />400,000
<br />342,100
<br />- 2,9g01By ACOE, county share paid
<br />5290.36,FIRE
<br />_-
<br />HPP Volunteer Fre Station_Water Main
<br />Complete
<br />Install waterline (Hwy 130 to 21st St)
<br />01-99 613012004
<br />1999A
<br />61,195
<br />61,195
<br />33,595Complete
<br />5296.62'.DPW
<br />Keepu-Hienaloli Flood _Control Project
<br />In progress
<br />Feasibility study- ACOE
<br />01-56 6/3012004
<br />Any12001N2003A
<br />800,000,
<br />613,550
<br />236,3501 By ACOE, county share paid
<br />5591.65 P&R
<br />Kawananakoa Gym
<br />,Complete
<br />Contact new gym
<br />01-56 6/30/2004
<br />Any101A/Pk Ded
<br />500,000
<br />267,335
<br />2,0261 Construction completed
<br />5597.86P&R
<br />Lealoa Bay Beach Park Improvements
<br />Complete
<br />1,000,000
<br />01-122 6/30/2004
<br />CPF
<br />150,000
<br />150,000
<br />0 Construction completed
<br />4llo red. Unencumbered Balance that will loose if not encumbered by 6/30104
<br />_Play Equipment Upgrade
<br />_Lapse
<br />-
<br />01-56 6/30/2004
<br />Any
<br />_500,000
<br />5697.76 DEM
<br />Queen Liliuokalani Collector Sewer
<br />In progress
<br />Design collector
<br />01-56 6/30/2004
<br />2003A
<br />500,000.
<br />500,000
<br />500,0001Design phase
<br />5599.42;DEM
<br />Wastewater Disposal System Upgrade
<br />In progress
<br />Design coni from cesspool to septic tank
<br />01-56 fi13012004
<br />2001A
<br />250,000
<br />250,000
<br />140, 4061 Design phase
<br />5691.33,DEM
<br />Komohana Heights Collector Sewer
<br />In progress- -Design
<br />collector
<br />01-56 613012004
<br />2001A
<br />100,000
<br />100,000
<br />100,0001 Design phase
<br />5391.54=DPW
<br />Kawailani Street Bridge -Replacement
<br />In progress
<br />Replace culvert with new bridge
<br />_
<br />01-56 6/3_012004.
<br />Any/200A
<br />4,500,0001
<br />100,000
<br />100,MDesign phase
<br />5396.29 DPW
<br />Lako Street Extension _
<br />In progress
<br />Extend Lako Street
<br />01-56 6130/2004
<br />Any/99A _
<br />3,000,000 2,720,000
<br />2,719, 8571 Planning phase
<br />5396.27 DPW
<br />Patent Road Safety Improvements-
<br />i!In progress
<br />Reappropriate 5397.98
<br />01-56 6130/2004_1999A
<br />1,8500 00
<br />1,534,100 1 Design phase
<br />5399.91 DPW
<br />ADA Curb Ramp Compliance Program, Phase II
<br />In progress
<br />_InstaNreplace curb ramps
<br />0243 6130/2004
<br />2001A
<br />1,700,000.1,700,000
<br />1,229,2531 Design 75% compete
<br />5393.46 DPW
<br />KaloarMamalahoa Bride Replacement
<br />P 9
<br />do progress
<br />Replace bridge feasibllity study
<br />_
<br />_
<br />01-56 613012004
<br />_
<br />Anyll999A
<br />18_3,000
<br />_
<br />182,285
<br />_182,2371 Ready for construction
<br />5396.33 DPW
<br />Alii Drive Road Improvement - County
<br />In progress
<br />_Along Dow Bay
<br />01-120- 6130/2004,
<br />- BF
<br />80,000'.
<br />80,000.
<br />12,704'1 Design phase
<br />5296.61 FIRE
<br />Kalaoa Fire Station
<br />In progress
<br />Construct new fires station
<br />01-56 6130/2004
<br />1999A
<br />1,691,000
<br />1,691,000
<br />1,691,0001In progress
<br />5599.39 P&R
<br />ADA Compliance
<br />In progress
<br />Accessibility improvements at rec facilities
<br />01-56 6/30/2004
<br />2001A
<br />2,000,000' 2,000,000
<br />212,6121 Transition plan implementation
<br />5590.31 P&R
<br />AhalanuJPohoikY i Ba Park Improvements
<br />-
<br />In ro9ress
<br />-
<br />- -
<br />62-M6/3012004
<br />36
<br />Ani
<br />Y
<br />_ _.-
<br />1.071,235
<br />230,800
<br />-.__. ,
<br />2,6131 Design phase
<br />5599.40 PI
<br />Repairs to Facilities
<br />in progress -
<br />Repair/upgrade Parks & rec facilities
<br />01-56 6130/2_ON
<br />500,000
<br />500,000
<br />1,0891 Construction in progress
<br />5590.30 P&R
<br />Volcano Park Multi -Purpose Playcourt
<br />In progress
<br />Reappropriate 5590.25
<br />_
<br />01-93 6/30/2004
<br />_CPF1GF199A/OIA
<br />1999A
<br />81,800
<br />81,800
<br />24,738'Conslruction completed/Phase 2 design
<br />5597,87 P&R
<br />Mholu Beanh Park Improvements
<br />In progress
<br />Reappropnate 5597 78 _ _
<br />02-18.613012004
<br />1999A
<br />66,846
<br />66,846 _ _
<br />66,457 Redesign phase
<br />5594.44_P&R
<br />Waimea Senior Center Renovations
<br />In progress
<br />Repairs and renovations
<br />02-19 6/3012004
<br />1999A
<br />16,055
<br />16,055,
<br />16,055 Design phase
<br />,691.32iDEM
<br />Ainako-Aina Nani Subdivision Sewer
<br />Lapse
<br />Contruct collector sewer
<br />01 - 56 6/3012004
<br />SRF
<br />3,400,000
<br />1691.31 DEM
<br />Puueo Collector Sewer
<br />Lapse
<br />1 Contact collector sewer
<br />01-56;6/3012004
<br />_
<br />SRF
<br />2,000,000
<br />,69135; DEM
<br />Hilo Landfill Closure
<br />Lapse
<br />Plans and designs
<br />01-56 6/3012004
<br />Any
<br />900,000_
<br />,691.34 DEM
<br />Hilo WWTP Warehouse Fasifity
<br />_ _ Lapse
<br />_ Construct facility _
<br />--Or 5_6_6/3012004
<br />Any
<br />350,000
<br />169774DEM
<br />Lunapule Collector Sewer
<br />Lapse
<br />Construct collector sewer
<br />01-56 613012004
<br />SRF
<br />350,000
<br />697.75 DEM
<br />Honokohau SPS & FM
<br />Lapse
<br />Reappropnate 5697.64
<br />01 56 613012004
<br />Any
<br />200,000
<br />396.28 DPW
<br />Mamalahoa Hwy Improvements (Honalo to Capt
<br />Cooke Lapse
<br />Resurfacing
<br />01-56 6130/2004
<br />Any
<br />7,000,000
<br />.299.37 DPW
<br />FEMA Flood Studies for County of Hawaii
<br />Lapse
<br />Develop Flood Insurance Rate Maps
<br />01-56 6/30/2004
<br />Any
<br />1,000,000
<br />Design completed - on hold _
<br />Design 95% complete - on hold
<br />_ Need allotment
<br />Design complete- need allotment
<br />_ 1 Need allotment_ _-
<br />5391.51 DPW
<br />Pauah, Street Resurfacing (Kam Ave. to Kilauea Ave.):Lapse
<br />Resurfacing project
<br />01-56 6/30/2004
<br />Any
<br />1,000,000
<br />5391.50 DPW
<br />Mohouli-Kumukoa Traffic Signal System - _- -
<br />Lapse
<br />Install signal system
<br />01-56 6130/2004
<br />Any
<br />_
<br />5391.53 DPW
<br />Ami Drive Curve Improvements _.o._
<br />Lapse
<br />Widen/resurface-Waiakea Uka Gym vicinih 01-56 6/30/2004
<br />__.
<br />Any
<br />_1_,000,000
<br />300,000
<br />5390.24 DPW
<br />,Puna Maki Alternate Route -Study Council District 5
<br />Lapse
<br />02-79 ', 6/30/2004
<br />Any
<br />250,000
<br />5396.30 DPW
<br />Resurface Mamalahoa Hwy Kainaliu-Kealakekua
<br />Lapse
<br />Resurfacing
<br />01-56 6/30/2004
<br />Any
<br />190,000
<br />5391.52 DPW
<br />East Hawaii Drainage Improvements
<br />Lapse
<br />Council Districts 1,2,3,4,5
<br />01-56 6/30/2004
<br />Any
<br />150,000
<br />5399.87, DPW
<br />Land Acquisition for Public Works FacilitiesLapse
<br />Righ-opway acquisitions
<br />01-56 6/3012004.
<br />Any
<br />100,000
<br />5396,31 -DPW
<br />Roundabout at Nam Kailua Df and Kakalina_Str_ee_t__'Lapse
<br />Install roundabout
<br />01-566/30/2004_
<br />Any
<br />100,000
<br />53934A DPW
<br />OpealMamalahoa Bridge Replacement
<br />Lapse
<br />-Design bridge replacement_ _01_56
<br />6/30/2004
<br />Any _
<br />44000. _ -Design phase
<br />5599.44 P&R
<br />_Play Equipment Upgrade
<br />_Lapse
<br />_Upgrade to safety/accessibility standards
<br />01-56 6/30/2004
<br />Any
<br />_500,000
<br />5593.87 P&R
<br />Honokaa Pool Improvements
<br />Lapse
<br />Reconstruction/repair
<br />01-56 6/30/2004
<br />Any
<br />250,000
<br />5/4/2004
<br />
|