Laserfiche WebLink
Table 6 Lapse Report <br />AcctNo_Aoencv <br />ProiectTitle <br />Ds sition <br />Desi <br />CrdNo LapseDate, <br />FundSource <br />AoornAmt Allotment UnexcendAll� Status- <br />ated/Exoended <br />Puueo Collector Sewer <br />Lapse <br />1 Contact collector sewer <br />01-56;6/3012004 <br />_ <br />SRF <br />2,000,000 <br />,69135; DEM <br />_ <br />5292.30 DPW <br />Palai Stream Flood Control (ACOE) <br />In progress_ <br />_Feasibility study ACOE _ _ <br />_ 01-56 613012004 <br />_Any/2001A/2003A <br />400,000 <br />342,100 <br />- 2,9g01By ACOE, county share paid <br />5290.36,FIRE <br />_- <br />HPP Volunteer Fre Station_Water Main <br />Complete <br />Install waterline (Hwy 130 to 21st St) <br />01-99 613012004 <br />1999A <br />61,195 <br />61,195 <br />33,595Complete <br />5296.62'.DPW <br />Keepu-Hienaloli Flood _Control Project <br />In progress <br />Feasibility study- ACOE <br />01-56 6/3012004 <br />Any12001N2003A <br />800,000, <br />613,550 <br />236,3501 By ACOE, county share paid <br />5591.65 P&R <br />Kawananakoa Gym <br />,Complete <br />Contact new gym <br />01-56 6/30/2004 <br />Any101A/Pk Ded <br />500,000 <br />267,335 <br />2,0261 Construction completed <br />5597.86P&R <br />Lealoa Bay Beach Park Improvements <br />Complete <br />1,000,000 <br />01-122 6/30/2004 <br />CPF <br />150,000 <br />150,000 <br />0 Construction completed <br />4llo red. Unencumbered Balance that will loose if not encumbered by 6/30104 <br />_Play Equipment Upgrade <br />_Lapse <br />- <br />01-56 6/30/2004 <br />Any <br />_500,000 <br />5697.76 DEM <br />Queen Liliuokalani Collector Sewer <br />In progress <br />Design collector <br />01-56 6/30/2004 <br />2003A <br />500,000. <br />500,000 <br />500,0001Design phase <br />5599.42;DEM <br />Wastewater Disposal System Upgrade <br />In progress <br />Design coni from cesspool to septic tank <br />01-56 fi13012004 <br />2001A <br />250,000 <br />250,000 <br />140, 4061 Design phase <br />5691.33,DEM <br />Komohana Heights Collector Sewer <br />In progress- -Design <br />collector <br />01-56 613012004 <br />2001A <br />100,000 <br />100,000 <br />100,0001 Design phase <br />5391.54=DPW <br />Kawailani Street Bridge -Replacement <br />In progress <br />Replace culvert with new bridge <br />_ <br />01-56 6/3_012004. <br />Any/200A <br />4,500,0001 <br />100,000 <br />100,MDesign phase <br />5396.29 DPW <br />Lako Street Extension _ <br />In progress <br />Extend Lako Street <br />01-56 6130/2004 <br />Any/99A _ <br />3,000,000 2,720,000 <br />2,719, 8571 Planning phase <br />5396.27 DPW <br />Patent Road Safety Improvements- <br />i!In progress <br />Reappropriate 5397.98 <br />01-56 6130/2004_1999A <br />1,8500 00 <br />1,534,100 1 Design phase <br />5399.91 DPW <br />ADA Curb Ramp Compliance Program, Phase II <br />In progress <br />_InstaNreplace curb ramps <br />0243 6130/2004 <br />2001A <br />1,700,000.1,700,000 <br />1,229,2531 Design 75% compete <br />5393.46 DPW <br />KaloarMamalahoa Bride Replacement <br />P 9 <br />do progress <br />Replace bridge feasibllity study <br />_ <br />_ <br />01-56 613012004 <br />_ <br />Anyll999A <br />18_3,000 <br />_ <br />182,285 <br />_182,2371 Ready for construction <br />5396.33 DPW <br />Alii Drive Road Improvement - County <br />In progress <br />_Along Dow Bay <br />01-120- 6130/2004, <br />- BF <br />80,000'. <br />80,000. <br />12,704'1 Design phase <br />5296.61 FIRE <br />Kalaoa Fire Station <br />In progress <br />Construct new fires station <br />01-56 6130/2004 <br />1999A <br />1,691,000 <br />1,691,000 <br />1,691,0001In progress <br />5599.39 P&R <br />ADA Compliance <br />In progress <br />Accessibility improvements at rec facilities <br />01-56 6/30/2004 <br />2001A <br />2,000,000' 2,000,000 <br />212,6121 Transition plan implementation <br />5590.31 P&R <br />AhalanuJPohoikY i Ba Park Improvements <br />- <br />In ro9ress <br />- <br />- - <br />62-M6/3012004 <br />36 <br />Ani <br />Y <br />_ _.- <br />1.071,235 <br />230,800 <br />-.__. , <br />2,6131 Design phase <br />5599.40 PI <br />Repairs to Facilities <br />in progress - <br />Repair/upgrade Parks & rec facilities <br />01-56 6130/2_ON <br />500,000 <br />500,000 <br />1,0891 Construction in progress <br />5590.30 P&R <br />Volcano Park Multi -Purpose Playcourt <br />In progress <br />Reappropriate 5590.25 <br />_ <br />01-93 6/30/2004 <br />_CPF1GF199A/OIA <br />1999A <br />81,800 <br />81,800 <br />24,738'Conslruction completed/Phase 2 design <br />5597,87 P&R <br />Mholu Beanh Park Improvements <br />In progress <br />Reappropnate 5597 78 _ _ <br />02-18.613012004 <br />1999A <br />66,846 <br />66,846 _ _ <br />66,457 Redesign phase <br />5594.44_P&R <br />Waimea Senior Center Renovations <br />In progress <br />Repairs and renovations <br />02-19 6/3012004 <br />1999A <br />16,055 <br />16,055, <br />16,055 Design phase <br />,691.32iDEM <br />Ainako-Aina Nani Subdivision Sewer <br />Lapse <br />Contruct collector sewer <br />01 - 56 6/3012004 <br />SRF <br />3,400,000 <br />1691.31 DEM <br />Puueo Collector Sewer <br />Lapse <br />1 Contact collector sewer <br />01-56;6/3012004 <br />_ <br />SRF <br />2,000,000 <br />,69135; DEM <br />Hilo Landfill Closure <br />Lapse <br />Plans and designs <br />01-56 6/3012004 <br />Any <br />900,000_ <br />,691.34 DEM <br />Hilo WWTP Warehouse Fasifity <br />_ _ Lapse <br />_ Construct facility _ <br />--Or 5_6_6/3012004 <br />Any <br />350,000 <br />169774DEM <br />Lunapule Collector Sewer <br />Lapse <br />Construct collector sewer <br />01-56 613012004 <br />SRF <br />350,000 <br />697.75 DEM <br />Honokohau SPS & FM <br />Lapse <br />Reappropnate 5697.64 <br />01 56 613012004 <br />Any <br />200,000 <br />396.28 DPW <br />Mamalahoa Hwy Improvements (Honalo to Capt <br />Cooke Lapse <br />Resurfacing <br />01-56 6130/2004 <br />Any <br />7,000,000 <br />.299.37 DPW <br />FEMA Flood Studies for County of Hawaii <br />Lapse <br />Develop Flood Insurance Rate Maps <br />01-56 6/30/2004 <br />Any <br />1,000,000 <br />Design completed - on hold _ <br />Design 95% complete - on hold <br />_ Need allotment <br />Design complete- need allotment <br />_ 1 Need allotment_ _- <br />5391.51 DPW <br />Pauah, Street Resurfacing (Kam Ave. to Kilauea Ave.):Lapse <br />Resurfacing project <br />01-56 6/30/2004 <br />Any <br />1,000,000 <br />5391.50 DPW <br />Mohouli-Kumukoa Traffic Signal System - _- - <br />Lapse <br />Install signal system <br />01-56 6130/2004 <br />Any <br />_ <br />5391.53 DPW <br />Ami Drive Curve Improvements _.o._ <br />Lapse <br />Widen/resurface-Waiakea Uka Gym vicinih 01-56 6/30/2004 <br />__. <br />Any <br />_1_,000,000 <br />300,000 <br />5390.24 DPW <br />,Puna Maki Alternate Route -Study Council District 5 <br />Lapse <br />02-79 ', 6/30/2004 <br />Any <br />250,000 <br />5396.30 DPW <br />Resurface Mamalahoa Hwy Kainaliu-Kealakekua <br />Lapse <br />Resurfacing <br />01-56 6/30/2004 <br />Any <br />190,000 <br />5391.52 DPW <br />East Hawaii Drainage Improvements <br />Lapse <br />Council Districts 1,2,3,4,5 <br />01-56 6/30/2004 <br />Any <br />150,000 <br />5399.87, DPW <br />Land Acquisition for Public Works FacilitiesLapse <br />Righ-opway acquisitions <br />01-56 6/3012004. <br />Any <br />100,000 <br />5396,31 -DPW <br />Roundabout at Nam Kailua Df and Kakalina_Str_ee_t__'Lapse <br />Install roundabout <br />01-566/30/2004_ <br />Any <br />100,000 <br />53934A DPW <br />OpealMamalahoa Bridge Replacement <br />Lapse <br />-Design bridge replacement_ _01_56 <br />6/30/2004 <br />Any _ <br />44000. _ -Design phase <br />5599.44 P&R <br />_Play Equipment Upgrade <br />_Lapse <br />_Upgrade to safety/accessibility standards <br />01-56 6/30/2004 <br />Any <br />_500,000 <br />5593.87 P&R <br />Honokaa Pool Improvements <br />Lapse <br />Reconstruction/repair <br />01-56 6/30/2004 <br />Any <br />250,000 <br />5/4/2004 <br />