My WebLink
|
Help
|
About
|
Sign Out
Home
COM 0522.002 2002-2004
ClerkCouncil
>
Council Records
>
Communications
>
2002-2004
>
COM 0522.002 2002-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/17/2019 12:29:43 PM
Creation date
5/10/2008 12:45:40 AM
Metadata
Fields
Template:
Communications
Communications - Type
COM
Communications - Council Term
2002-2004
Communication
0522
Point
002
Author
Harry Kim, Mayor
Communications - Referred To
Council
Comments
Council: Amends Bill 238, Draft 2, to Draft 3 - 05/19/04
Document Relationships
AGE COUNCIL 05/19/2004 2002-2004
(Related)
Path:
\Council Records\Agendas\2002-2004\Council
BIL 238 Draft 02 2002-2004
(Related To)
Path:
\Council Records\Bills\2002-2004
BIL 238 Draft 02 2002-2004
(Related)
Path:
\Council Records\Bills\2002-2004
COM 0522.000 2002-2004
(Related)
Path:
\Council Records\Communications\2002-2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Hawaii County Council <br />Page 2 <br />May 5, 2004 <br />The selected projects met at least one of the following criteria (see Table 3): <br />1) Legal mandate—approximately $14.25M relates to unfunded mandates such as ADA, EPA gang cesspool prohibitions, EPA <br />landfill restrictions, and legal settlements such as with the union representing the lifeguards; <br />2) Critical for public safety or health—approximately $8.86M relates to protection of public safety (e.g., emergency response, flood <br />control) or public health (sanitation); <br />3) Priority objectives—approximately $52.41M relates to targeted objectives that include ameliorating Kona, Waimea, and Puna <br />traffic (including all of the Subpart B projects), managing solid waste, maintaining/improving public parks, increasing public <br />access to the shoreline, and encouraging affordable housing;Z <br />4) Major deficiency approximately $13.18M relates to meeting basic level of service goals and maintenance standards. <br />Of the 60 Capital Budget Subpart A and B projects, 35 are new facilities or miscellaneous improvements ($57.46M), 4 are replacement of <br />existing facilities ($6.57M), and 21 are improvements to existing facilities ($24.66M) (see Table 2). Approximately 54% of the budget is <br />for transportation projects, followed by public health and safety projects (28%), culture/recreation (9%), and general government facilities <br />(9%) (see Table 4 and Figure 1). <br />Funding Sources <br />Capital projects are typically funded by debt (bonds, State Revolving Fund loans), revenue sources (fuel tax, other special revenues, fair <br />share contributions), State CII' grants, and various federal grant or loan sources. The projects funded by fuel tax are approved in a <br />separate ordinance. The Capital Budget presented herein includes those capital projects intended to be funded in whole or part by bonds <br />or special revenues and State Revolving Fund loans. The Highway Fund projects are the only proposed Capital Budget projects intended <br />to be funded from current revenues. <br />The State Revolving Fund, which is a low interest loan program for wastewater projects, is the proposed source for five projects totaling <br />$13.55M—three of the projects are to replace large -capacity cesspools in areas with County sewer systems (Komohana Heights, Queen <br />Liliuokalani subdivision) or at County facilities, one is to extend the sewer system in a high priority coastal area (Kalanianaole collector <br />sewer in Keaukaha), and the fifth is a followup phase of the Kealakehe effluent reuse project. There are no projects requiring County <br />matching for federal highway funding since all matching requirements for County projects on the State Transportation Improvements <br />Program (STIP) for this coming fiscal year are covered by existing appropriations. Two federal Special Purpose Grants require <br />s More specific rationale for the Subpart B Kona projects are provided in the Department of Public Works' summary project list. <br />
The URL can be used to link to this page
Your browser does not support the video tag.