My WebLink
|
Help
|
About
|
Sign Out
Home
COM 0521.052 2002-2004
ClerkCouncil
>
Council Records
>
Communications
>
2002-2004
>
COM 0521.052 2002-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2008 6:09:28 PM
Creation date
5/10/2008 12:51:21 AM
Metadata
Fields
Template:
Communications
Communications - Type
COM
Communications - Council Term
2002-2004
Communication
0521
Point
052
Author
Michael Tulang, Councilmember
Communications - Referred To
Council
Comments
Council: Close file - 6/2/04 Presented: Council - 6/02/04
Document Relationships
BIL 237 Draft 03 2002-2004
(Related)
Path:
\Council Records\Bills\2002-2004
COM 0521.000 2002-2004
(Related)
Path:
\Council Records\Communications\2002-2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
hn~c not ~~et been perfunnal, huf have been propoved us additional wort.. Fulkn~ in_ is a description and <br /> projected cost for each. <br /> _ a) Prepare an NPDES Construction Storm~~afer Permit ?pplicalion -The scope covers onl}' <br /> solid waste operations permits, and stabs that additional permits may be identified thnt <br /> ' would require a contract modillea(ion. It has been determined thnt the Stale of I-[a«aii <br /> requires ?If construction activities that ~~-ill dishnb more than 1 aa~e of land to obtain an <br /> NPDI?.S Construction stormwater discharge permit regardless of whether stormwater is <br /> expected to be discharged off site. Under This task the appropriate Corms and plans to <br /> support construction of dre project will he prepared, "Che task will be completed in hvo <br /> phases. The initial phase to be done as soon as possible will be for preparation of the <br /> NOI-FORM C to the ~~reatest extent feasible without input from the selected contractor. <br /> Phase II will be completed iu association ith the general contractor after the boat <br /> selection. Phase I will include the design drawings, grading plans and volumes, <br /> probable locations of stornnvaler and general best management practices. Phase [I will <br /> include specific 13MYs and methods for prevention of rum~ff, which must be developed <br /> in concurrence with the general contractor. <br /> Fhase I of the permit application will complete all plans and figures associated with the <br /> application with the exception of the detailed Best Management Practices and stockpile <br /> locations. Phase I will require approximately SS man-hours for completion wide an <br /> additional 10 hours of drafting from URS. Phase I can be completed within 3 weeks of <br /> notice to proceed. Dmid Robichaax $3,550 <br /> Phase II will require approximately 25 hom s of labor and 8 hours of drafting. Phase II <br /> can he completed within 1 week of selection of the general contractor. Dm~id <br /> Robiclzauc $2,400 <br /> b) Prepare NPDGS Industrial Stornnvater Discharge Permit Application and Industrial <br /> Stonnwater Pollution Control Plan. 'hhe NPDES Industrial stormwater Discharge <br /> permit is required of select indusfJies to reduce the amount of pollution originating at <br /> industrial sites with the potential for generating significant amounts of pollutants in <br /> stormwater rmtoff. Recycling is an industry that is identified as requiring an NPDES <br /> industrial stormwater permit. "Che permit should be in place at the time the facility <br /> begins recycling activities. The Task involves preparation of an NPDES Donn B, which <br /> is quite similar to Ponn C described in Task 1, with the exception of figures and <br /> analytical testing. The permit must be accompanied by a Stonnwatcr Pollution Control <br /> Plan, which describes the detailed operating and management practices required to <br /> reduce the incidence of pollutants entering stormwater runoff. The NPDGS penmit <br /> application could be prepared by either County staff or the contractor. <br /> Donn B application including drafting. Dur~fd Rohichaux $2,000 <br /> The stormwater Pollution Control Plan can be prepared in Draft and Final form. The <br /> stormwater Pollution Control Plan will require approximately 2 mouths for preparation <br /> and should be completed prior to acceptim_ waste. David Robichazrc $12,000 <br /> c) Revise existing design drawings with new drawings to match the new layout. <br /> • New storm water calculations, draina,c area dMermmalion, Rsite drainage plan. <br /> i <br /> 6 <br /> ~ - ~n~NIHNfVV tIVI[rvl ~ WRIiT EN NOTICE TO THE CERmPCgiE H01_pEH NAMED HEREIN, BUT FpIWRE TO MAIL SUCH <br /> <br /> ATTN: BARBARA BELL~DIRECTOR woncE Srwu iMEOSe no oeueanon on uaeiurv ornuv Keno uron THE wsunEn <br /> <br /> 25 gUPUNI STREET, #208 nrroaoiwc covena~E, irs aceNrs on REPaESenirnrves, on n~E issuen or rws <br /> HII n HI np~on <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.