Laserfiche WebLink
This average 300-foot wide strip of land shall be credited against the impact fee requirement <br /> relating to park and recreational improvements and facilities as outlined in Condition KK. <br /> 5. Add new Condition P: The applicant shall develop and implement monitoring programs for <br /> groundwater and neaz shore water quality and near shore mazine life compazable to the <br /> programs required by the SMA Use Permit and Use Permit for the adjoining "Kohanaiki" <br /> property to the south (TMK: 7-3-09: 0031. These programs shall be approved by the <br /> Planning Director in consultation with the Natural Energy Laboratory of Hawaii, the Ocean <br /> Recreation Council (TORCH), and the National Park Service. <br /> 6. Add new Condition Q: In order to mitigate potential impacts from non-point source <br /> pollutants the applicant shall participate with the County of Hawaii in a pilot storm drain <br /> program for roadways within the Kohanaiki-O'oma region. The pilot program may <br /> potentially include other developments within the County and apply to all other government <br /> andprivate developments In that regazd the drainage system within the road rights-of--way <br /> shall include storm drain filtration devices which meet the approval of the Department of <br /> Public Works and the applicable permitting requirements of the Underground Infection <br /> Control (UIC) of the Federal Safe Drinking Water Act and the National Pollutant Discharge <br /> Elimination System (NPDES) of the Federal Clean Water Act. The roadway and related <br /> improvements covered herein shall be considered eligible for dedication to the County of <br /> Hawaii. <br /> 7. Add new Condition X: The applicant shall expend up to $750,000 to prepare or cause the <br /> preparation of construction plans under the supervision of and meeting with the approval <br /> and requirements of the State Department of Transportation (DOT) for the widening of the <br /> Queen Ka' ahumanu Highway between the end of Phase I in the vicinity of the Honokohau <br /> Boat Hazbor to the Kona Airyort. A scope of work for the construction plans shall be <br /> submitted to the State DOT within 90 days of the effective date of this ordinance. The <br /> applicant shall make its best effort to have the construction plans submitted to the State DOT <br /> for review and approval within a year of the approval of the scope of work The cost to <br /> prepare this plan shall be credited against Conditions X and KK relating to regional roadway <br /> improvements. <br /> In Bill No. 178, Draft 4, conditions and references to such, have been re-alphabetized as appropriate. <br /> If you have any questions, please do not hesitate to contact me. Thank you for your assistance with <br /> this matter. <br /> <br /> Attachments <br /> <br /> Ctd <br /> <br />