My WebLink
|
Help
|
About
|
Sign Out
Home
COM 0400.092 2002-2004
ClerkCouncil
>
Council Records
>
Communications
>
2002-2004
>
COM 0400.092 2002-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2008 11:23:13 AM
Creation date
5/10/2008 12:54:12 AM
Metadata
Fields
Template:
Communications
Communications - Type
COM
Communications - Council Term
2002-2004
Communication
0400
Point
092
Author
Harry Kim, Mayor
Communications - Referred To
COUNCIL
Comments
Council: Close file - 8/4/04 Presented: Council - 8/4/04
Document Relationships
BIL 178 Draft 01 2002-2004
(Related)
Path:
\Council Records\Bills\2002-2004
COM 0400.000 2002-2004
(Related)
Path:
\Council Records\Communications\2002-2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.2.1. the director shall, not less frequently than annually, prepare and submit to <br /> the county council an annual report. The report shall include: <br /> 3.2.1.1. growth trends and projections; <br /> 3.2.1.2. proposed changes to the boundaries of the tiered geographic areas <br /> that determine where concurrency requirements apply; <br /> 3.2.1.3. proposed changes to existing level of service standards; <br /> 3.2.1.4. proposed changes in concurrency analysis methodologies or <br /> amendments to this article; <br /> 3.2.1.5. other data, analysis, or recommendations as the director may deem <br /> appropriate, or as may be requested by the county council. <br /> <br /> 4. Procedures for concurrency Review <br /> 4.1. Submittal Requirements. All rezoning applications shall include in its <br /> environmental report sufficient information to determine the impact of the <br /> proposed development on public facilities. The information required shall <br /> include, but shall not be limited to: <br /> 4.1.1. identification of the tiered geographic area in which the project is located; <br /> 4.1.2. the proposed timing and phasing of the development; <br /> 4.1.3. the existing level of service for the various public facilities impacted by <br /> the development; <br /> 4.1.4. the incremental change in the level of service resulting from the project; <br /> 4.1.5. proposed mitigation measures, as appropriate. <br /> 4.2. Department Review and Recommendation. Upon review of the information, the <br /> department's staff report shall include at a minimum the following findings and <br /> recommendations on concurrency: <br /> 4.2.1. description of the proposed development, including the timing and <br /> phasing; <br /> 4.2.2. identification of the specific public facilities impacted by the proposed <br /> development; <br /> 4.2.3. capacity of the affected public facilities based on the adopted level of <br /> service relative to existing and approved development; and <br /> 4.2.4. availability of existing capacity to accommodate the proposed <br /> development; or if existing capacity is not available, planned capacity and <br /> the year in which such planned capacity is projected to be available to serve <br /> the proposed development. <br /> 4.2.5. recommendation: <br /> 4.2.5.1. Positive concurrency determination. If the director concludes that <br /> each public facility will be available concurrent with the impacts of the <br /> proposed development at the adopted levels of service, the department <br /> shall make a positive recommendation in its staff report. <br /> 4.2.5.2. Negative concurrency determination. If the director determines <br /> that any public facility will not be available concurrent with the impacts <br /> of the proposed development at the adopted levels of service, the <br /> director shall make a negative concurrency recommendation. <br /> 4.2.5.3. Conditional positive determination. If modification of the project <br /> scope or timing or public facility capacity improvements are feasible, <br /> the director may make a positive determination of concurrency subject <br /> to one or more of the following conditions: <br /> 9 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.