My WebLink
|
Help
|
About
|
Sign Out
Home
RES 260 Draft 01 2002-2004
ClerkCouncil
>
Council Records
>
Resolutions
>
2002-2004
>
RES 260 Draft 01 2002-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2008 8:59:10 PM
Creation date
5/10/2008 1:01:04 AM
Metadata
Fields
Template:
Bill/Resolution
Bill/Resolution - Type
RES
Bill/Resolution - Council Term
2002-2004
Bill/Resolution
260
Draft
01
Introducer
Aaron S. Y. Chung, Councilmember Chair, Finance Committee
Referred To
FC
Action 1
FC-345: Recommends adoption of Res. 260-04 - 11/9/04
Action 2
Council: Adopts Resolution 260-04; adopts FC-345 - 11/24/04
Status
Adopted
Date To Mayor or Adoption Date
11/24/2004
Reading Number
1
Reading Date
11/24/2004
Ayes
8-Arakaki;Elarionoff;Holschuh, M. D.;Jacobson;Reynolds;Safarik;Tulang;Tyler, III
Noes
0-
Absent
1-Chung
Excused
0-
Document Relationships
AGE COUNCIL 11/24/2004 2002-2004
(Related)
Path:
\Council Records\Agendas\2002-2004\Council
AGE FC 11/09/2004 2002-2004
(Related)
Path:
\Council Records\Agendas\2002-2004\Finance Committee (FC)
BIL 363 Draft 01 2002-2004
(Related)
Path:
\Council Records\Bills\2002-2004
BIL 363 Draft 01 2002-2004
(Related To)
Path:
\Council Records\Bills\2002-2004
COM 0832.000 2002-2004
(Related To)
Path:
\Council Records\Communications\2002-2004
COM 0832.000 2002-2004
(Related)
Path:
\Council Records\Communications\2002-2004
REP FC 345 11/09/2004 2002-2004
(Related To)
Path:
\Council Records\Reports\2002-2004\Finance Committee (FC)
REP FC 345 11/09/2004 2002-2004
(Related)
Path:
\Council Records\Reports\2002-2004\Finance Committee (FC)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCHEDULE A <br /> RADIO SPINE BOARD PURCHASE <br /> Project Number: EMOS-04 (O1-H-O1) <br /> MISSION/GOAL - <br /> (State your mission or goal that the project is trying to achieve. E.g. are you trying to <br /> reduce traffic injuries and fatalities? In what specific area of traffic, pedestrian, speeding, <br /> children?) <br /> The goals of this project are: 1) To eliminate collateral injury of accident patients; and 2) <br /> To increase survivability by eliminating the need to remove patients from spine boards <br /> for diagnostic x-rays. The County of Hawaii Fire Department is responsible for all <br /> emergency medical response for the entire island, and has begun outfitting each unit with <br /> a radio translucent spine board. This project will add three additional boards per unit and <br /> therefore enhance each unit's ability to cover multiple injuries at each vehicle accident. <br /> Once completed, no longer will patients suffer additional injury during x-rays, and a <br /> faster diagnostic process may result in quicker life saving treatment. <br /> STRATEGIES <br /> (What are you attempting to accomplish with this project? What you plan to do. E.g. <br /> developing permanent fitting stations for child restraints, enforcement activities, <br /> educational activities.) Use quantitive measures such as the number of training to be held, <br /> number of meetings to be held, number of roadblocks to be established, etc. <br /> This project will impact the entire island of Hawaii by enabling the distribution of radio <br /> <br /> translucent spine boards to all fourteen (14) ambulance units operated by the Fire <br /> Department. Upon delivery, the boards will be dispersed to each unit; no additional <br /> training is required (all new fire fighters are cross trained to Emergency Medical <br /> <br /> Technician level prior to permanent assignments). <br /> SOLUTION/IMPLEMENTATION <br /> <br /> (How will you get it done? E.g. hiring of personnel, purchasing of certain equipment, <br /> <br /> developing statewide conference, etc. The implementation phase should reflect what you <br /> <br /> will be asking for in your budget.) <br /> <br /> The project calls for the purchase of fifty (50) radio translucent spine boards. The <br /> <br /> distribution will be three boards per unit with the eight (8) spare boazds used as back up <br /> <br /> replacements to cover for the boards that are-sent with patients who are transferred off <br /> island for treatment. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.