Laserfiche WebLink
County may duplicate that staffing should the County desire. The Bidder will provide the computer <br /> scale system according to the County's specification. <br /> 2.3.5 All processes and storage shall be contained within buildings. <br /> 2.3.6 All exterior conveyors are to be covered but accessible. All conveyors are to be complete with <br /> dribble pans and chutes, scrapers, skirts, seals, etc., to contain all materials. Entry and discharge <br /> points of all equipment, conveyors, etc., are to be provided with dust and odor control devices. <br /> 2.3.7 All equipment such as mixers, screens, and trommels, which in their operation generate dust and <br /> odors, are to be totally enclosed and/or provided with an adequate odor and dust collecting system <br /> to prevent the release of odors and dust to the surrounding areas. <br /> 2.3.8 All shredders or grinders are to be designed to minimize damage and downtime due to explosions <br /> and fires. <br /> 2.3.9 Motor control centers located in areas that may be subject to dust conditions or exposed to <br /> washdown operations are to be housed in individual rooms properly vented. <br /> 2.3.10 Odor control measures shall be capable of containment and odor elimination. <br /> 2.3.11 Provisions for detecting and alarming radioactive waste shall be provided. <br /> 2.3.12 The proposed waste reduction facility shall be capable of expansion to handle the future waste <br /> projection included in Table 2.6 (Exhibit B) from the Final Environmental Impact Statement for the <br /> Construction and Operation of the East Hawaii Regional Sort Station, dated February, 2004, which <br /> may be found on the CountylDepartment website at httD://www.hawaii- <br /> county.com/env mng/ehrss htm. <br /> 2.3.13 The "Prototype Contract for Construction of the Solid Waste Reduction Facility attached hereto as <br /> "Appendex B" shall be considered a part of the specifications. Any variations, additions or <br /> deletions to that prototype contract must be included in offeror's proposal as exceptions and clearly <br /> labeled as such. <br /> 2.3.14 The "Prototype Contract for Operation of the Solid Waste Reduction Facility" attached hereto as <br /> "Appendix C" shall be considered a part of the specifications. Any variations, additions or <br /> deletions to that prototype contract must be included in offeror's proposal as exceptions and clearly <br /> labeled as such. <br /> 2.3.15 A method of conflict resolution between Contractor and County for both Construction and <br /> <br /> 1 Operations of the Solid Waste Reduction Facility shall be established according to "Prototype <br /> Agreement for Selection of and Resolution of Conflicts by Independent Third Party" attached <br /> RFP 2146 H WASTE REDUCTION TECHNOLOGY ~ SPECIFICATIONS ~ PAGE 7 OF 22 <br /> <br />