My WebLink
|
Help
|
About
|
Sign Out
Home
COM 0293.004 2004-2006
ClerkCouncil
>
Council Records
>
Communications
>
2004-2006
>
COM 0293.004 2004-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2008 4:44:06 AM
Creation date
5/8/2008 11:33:22 PM
Metadata
Fields
Template:
Communications
Communications - Type
COM
Communications - Council Term
2004-2006
Communication
0293
Point
004
Author
Jerome Warren
Communications - Referred To
FC
Comments
FC: Postponed to September 7, 2005 - 7/6/05 Presented: FC - 7/6/05
Document Relationships
AGE FC 07/06/2005 2004-2006
(Related)
Path:
\Council Records\Agendas\2004-2006\Finance Committee (FC)
COM 0293.000 2004-2006
(Related)
Path:
\Council Records\Communications\2004-2006
RES 108 Draft 01 2004-2006
(Related)
Path:
\Council Records\Resolutions\2004-2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SEWER ALTERNATIVES FOR NAALEHU COMMUNITY <br /> RESPONSIBLE COSTS HOMEOWNER <br /> ALTERNATIVE DESCRIPTION PARTY DE IGN CONSTRUCTION COSTS <br /> (CBCL) (Federal, State 8 County) <br /> t Construct new 6" sewers with manholes County (700%) $350,000 $1.6 million $15-20/month <br /> County takeover in the streets <br /> of entire sewer <br /> system Construct new community septic tank system <br /> 2 Construct community septic tank system County (Septic Tank/6" sewer) $78.000 $165,000 $10/rrwnih <br /> County takeover Community (4"sewer) plus cost for <br /> of existing 6" Construct new/modify manholes 4' sewer <br /> sewers only maintenance <br /> Repair existing 4" and 6" sewers <br /> Reroute existing 6" sewers around obstructions <br /> County owns and maintains septic tank <br /> antl 6" sewers <br /> Community owns and maintains 4" sewers <br /> 3 Construct new community septic tank system County (Septic Tank) $58,000 $100,000 $10/month <br /> County does Community (100% sewer) plus cost for <br /> not takeover Repair existing sewer pipe and vent defects existing sewer <br /> any sewers maintenance <br /> Existing sewers owned and maintained by <br /> the community <br /> County owns and maintains septic tank system <br /> 4 Construct cesspools for each resitlence Homeowner $2,000/home $1000 plus cost <br /> Individual far cesspool <br /> <br /> Cesspools Close existing community cesspools and maintenance <br /> sewer system <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.