Laserfiche WebLink
<br /> H. If the project is built before the partion of the Kahului to Keauhou Parkway is <br /> built through the property, access shall consist of (1) a main project entrance <br /> located in the right-of--way of the future Parkway, with an intersection on Kuakini <br /> Highway, and (2) at Kuakini Highway north of the Waiaha Drainageway. For the <br /> main project entrance, the applicant shall provide full intersection improvements <br /> at Kuakini Highway consisting of, but not limited to, pavement widening, a <br /> dedicated left turn storage lane, drainage improvements, and any relocation of <br /> utilities meeting with the approval of the Department of Public Works, and shall <br /> dedicate the necessary right-of--way to the County for its Kuakini Highway <br /> widening project at no cost to the County, prior to the issuance of a certificate of <br /> occupancy for any residential structures. Improvements maybe constructed in <br /> phases as the project is built out, with the approval of the Department of Public <br /> Works. The driveway from the intersection with Kuakini Highway to the main <br /> project entrance shall be constructed meeting with the approval of the Department <br /> of Public Works and shall, to the extent that it can be done without greatly <br /> increasing the cost to the applicant beyond the access needs of their project, be <br /> built so that it can be converted to be used as a portion of the Parkway when the <br /> Parkway is built. Upon construction of the Pazkway, the applicant, its successors, <br /> and assigns, shall be responsible for the cost of constructing a replacement access <br /> from the project to the Pazkway, at a location meeting with the approval of the <br /> Department of Public Works. The applicant shall have the right to require the <br /> Department of Public Works to finalize the access point prior to the issuance of <br /> plan approval for the project. The necessary intersection improvements shall be <br /> determined by the Department of Public Works and shall be limited to right-in, <br /> right-out only, unless otherwise determined by the Department of Public Works. <br /> The Department of Public Works may approve a secondary access to the Parkway <br /> as long as it is limited to a right-in only. Access (2) on Kuakini Highway shall be <br /> limited to right-out movements only. <br /> -5- <br /> <br />