Laserfiche WebLink
for emergency access purposes and be gated. The applicant shall provide a left <br /> tum storage lane on Hualalai Road to the subiect property prior to the issuance of <br /> a Certificate of Occupancy. All sight distances to the approach shall meet the <br /> requirements of the Hawaii Statewide Uniform Design Manual (AASHTO). <br /> Any utility poles in the road right-of--way shall be installed as shown on DPW <br /> Standard Detail R-35 (Revised). The applicant shall provide any necessary <br /> easements for installation of such utilities. <br /> <br /> ~H,j Any vehicular security sate shall be located a minimum of 60 feet (exclusive of <br /> gate swing) from the proposed Hualalai Road right-of--way with a turnaround on <br /> the County road side of the gate. This 60-foot requirement shall not apply to the <br /> emergency access. <br /> All development generated runoff shall be disposed of on-site and shall not be <br /> directed toward any adjacent properties. <br /> A drainage study shall be prepared by a licensed civil engineer and submitted to <br /> the Department of Public Works. The recommended drainage system shall be <br /> constructed, meeting with the approval of the Department of Public Works, prior <br /> to the issuance of a Certificate of Occupancy <br /> A Solid Waste Management Plan shall be submitted to the Department of <br /> Environmental Management prior to the issuance of a Certificate of Occupancy. <br /> Th_e_proiect shall connect to the County sewer system, meeting with the approval <br /> of the Department of Environmental Mana <br /> eg <br /> ment. <br /> -5- <br /> <br />