My WebLink
|
Help
|
About
|
Sign Out
Home
BIL 318 Draft 03 2004-2006
ClerkCouncil
>
Council Records
>
Bills
>
2004-2006
>
BIL 318 Draft 03 2004-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2008 2:46:26 PM
Creation date
5/9/2008 12:13:54 AM
Metadata
Fields
Template:
Bill/Resolution
Bill/Resolution - Type
BIL
Bill/Resolution - Council Term
2004-2006
Bill/Resolution
318
Draft
03
Introducer
Pete Hoffman, Council Chair
Referred To
COUNCIL
Action 1
Presented: Council - 5/16/07
Action 2
Council: Bill 318, Draft 3 held over pursuant to Council Rule 25 (e) - 5/16/07
Action 3
Council: Bill 318, Draft 3 passes second & final reading - 6/01/07
Status
Adopted
Date To Mayor or Adoption Date
6/12/2007
Reading Number
2
Reading Date
6/1/2007
Ayes
5-Ford;Hoffmann;Jacobson;Pilago;Yagong
Noes
4-Higa;Ikeda;Naeole;Yoshimoto
Absent
0-
Excused
0-
Document Relationships
AGE COUNCIL 2007/05/16 2006-2008
(Related)
Path:
\Council Records\Agendas\2006-2008\Council
AGE COUNCIL 2007/06/01 2006-2008
(Related)
Path:
\Council Records\Agendas\2006-2008\Council
COM 0307.015 2006-2008
(Related)
Path:
\Council Records\Communications\2006-2008
COM 0307.018 2006-2008
(Related To)
Path:
\Council Records\Communications\2006-2008
COM 0307.018 2006-2008
(Related)
Path:
\Council Records\Communications\2006-2008
ORD 2007-099 2006-2008
(Related To)
Path:
\Council Records\Ordinances\2007
ORD 2007-099 2006-2008
(Related)
Path:
\Council Records\Ordinances\2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
`Approved development' means development for which zonine has been eranted by the county. <br /> `Critical road area' means a geoeraphical azea where any of the transportation facilities serving the area <br /> <br /> have been determined by the council to be worse than the acceptable level of service. <br /> `Immediate vicinity of a proiect' means the azea in which transportation facilities will be required to <br /> mitigate impacts caused primarily by the proiect. <br /> `Level of service or LOS' means a qualitative measure describing operational conditions within a traffic <br /> stream and shall be determined usin¢ the procedures in the latest edition of the Hiehway Capacity <br /> Manual Transportation Research Board. <br /> `Mitigation' means specific actions to reduce traffic coneestion. Mitigation is of two tunes: `local <br /> mitigation' which consists of improvements to roads and intersections that are in the immediate vicinity <br /> of a proiect including channelization of intersections turn lanes into a proiect and similar <br /> improvements `Area mitigation' consists of improvements which increase the capacity of an arterial or <br /> other major road such as additional lanes in the general region containine the proiect, or construction of <br /> anew arterial or collector road in the general azea containing the project, or improvements to public <br /> transportation such as buses or park and ride facilities sufficient to offset the traffic demand generated <br /> by the proiect. <br /> `Occupancy' means (1) the issuance of a certificate of occupancy for a commercial, multifamily, <br /> industrial building hotel or other structure requiring a certificate of occupanc~2) the issuance of a <br /> building permit for residential buildings that do not require a certificate of occupancy: or (3) final <br /> subdivision approval for subdivisions where dwellings aze allowed, but dwellings are not being <br /> constructed before sale of any lot. <br /> `Proiect azea' means the area in which the proiect is expected to have an impact on the level of service <br /> of transportation facilities. <br /> `Reasonable assumptions' means the percentage of full build-out that is expected to occur during the <br /> twenty-year period after the date of the application as determined by the planning director. <br /> `Transportation facilities' means State and County hig iways roads and public transportation facilities <br /> `Worse than the acceptable level of service' means that the level of service at the AM or PM peak is "E" <br /> or "F" <br /> (d) Traffic Impact Analysis Report Required. <br /> ~1) A traffic impact analysis report (TIAR) prepared or updated within six months before the <br /> submission of the application shall be included with the application for any change of zone that can <br /> generate 50 or more peak hour trips The determination of peak hour tries shall be based on the Institute <br /> of Transportation Engineers "Trip Generation Handbook" or any other nationally recognized source. <br /> When the number of trips depends upon the exact future uses of the site, and those aze unknown at the <br /> time of rezoning jfor example the types of commercial used, the determination shall be based upon a <br /> 2 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.