Laserfiche WebLink
<br /> ~ e <br /> - plans <br /> As further assurance of project completion, a special <br /> condition will be added to Grant No. C15-0060-02 requiring the <br /> construction of Papaikou Phase. II and Paukaa Phase II projects in <br /> accordance with the previously identified schedule. The Hawaii <br /> Department of Health (HDOH) will track the condition on a <br /> quarterly basis as a part of their quarterly status report. <br /> Additionally, EPA, Region 9's Municipal Assistance Branch will <br /> track the County's progress on their audit tracking system. In <br /> the event the County fails to construct the collection systems as <br /> required by the special condition, the County will be required to <br /> repay a proportional share of the grant. <br /> Based on the documentation submitted to date and the soon to <br /> be added special condition to Grant No. C15-0060-02, I hereby <br /> find that the $6,891,902 previously disallowed is grant eligible. <br /> Eligible $6,891,902 Ineligible -0- <br /> Note 4 C15-0062-06 <br /> In the March 23, 1993 FDL, I disallowed $58,299 for the <br /> purchase of emergency generators for the Wailoa and Pua Pump <br /> Stations. The audit report states that the emergency generators <br /> are an unnecessary cost outside the scope of the approved project <br /> and are therefore an ineligible "add-on" which has no relation to <br /> the original grant. <br /> The original grant was awarded on August 13, 1984 to <br /> construct a collection system serving the Ice Pond area on the <br /> Island of Hawaii. Flows from the Ice Pond area are treated at <br /> the Hilo Wastewater Treatment Plant. On April 17, 1986, a grant <br /> amendment was processed which decreased the grant based on the <br /> March 19, 1986 Approval-to-Award for the installation of the <br /> generators. <br /> We disagree with the audit report's statement that the <br /> generators are an ineligible "add-on" which has no relation to <br /> the original grant. Emergency generators are an eligible item. <br /> Both the Wailoa and Pua Pump Stations are in the same facility <br /> planning area as the Ice Pond Collection System, as defined by <br /> the Clean Water Act, Section 212(2)(A), and 40 CFR 35.905. <br /> Sewage from the pump stations and the Ice Pond Collection System <br /> is treated at the Hilo Wastewater Treatment Plant. Although the <br /> generators were outside the scope of the original grant, the EPA <br /> Regional Administrator expanded the scope to include the <br /> generators by issuing an amendment in accordance with 40 CFR <br /> 35.903(d) and 40 CFR 30.700. <br /> Additionally, in regards to the absence of the generators in <br /> 3 <br /> <br />