r <br /> <br /> _ <br /> S _ <br /> ASSOCIATES, INC. Engineers/Architects <br /> Council Hearing <br /> Engineer's Presentation <br /> Date: February 6, 1997 <br /> Page 2 <br /> d. Selecting the contractor. <br /> e. Mobilizing and demobilizing crews and equipment. <br /> f. Providing for possible escalation of cost. <br /> g. Performing quality control and inspection. <br /> h. Providing contract management. <br /> At this time, there is an existing contract for the installation of a network of sewer lines in the <br /> Papaikou area. The contract started on June 5, 1996. It is proposed that this existing contract be amended to <br /> install the proposed extension. This existing contract is the result of the standard bidding and award <br /> procedures. That is after the planning, engineering and design were completed, bids were submitted by <br /> various companies and a low responsible bid by a qualified bidder was selected to perform the job. The <br /> selected lowest bidder was some 20% lower than the next lower bid which is substantial in this competitive <br /> business. The price of the proposed work will be only the direct costs ojconstruction and inspection, and <br /> they wall be based on the same unit cods of this on-going contract. <br /> The community will surely appreciate your favorable vote on this issue. We believe that the few <br /> individuals that opposed the extension will also be thankful to you in the future once they realize the benefits <br /> of having a complete wastewater network system that is provided and maintained by a qualified public <br /> agency personnel. <br /> Thank you for your time and effort throughout this hearing. <br /> Sincerely, <br /> GM~P <br /> ASSOCIATES, INC. <br /> Max M. Shoura, P.E. <br /> Senior Civil Engineer <br /> File 2461/01 <br /> 841 Bishop Street Suite 1501 Honolulu, Hawaii 9 6 813-3 915 Telephone: (808) 521-4711 Fax: (808) 538-3269 <br /> <br />