Laserfiche WebLink
<br /> Hawaii County Council <br /> <br /> Mazch 1, 2007 <br /> <br /> Project Selection Criteria <br /> In selecting the projects, funding requests from the agencies were initially screened to ensure that the agency had the capacity to <br /> implement the project during the fiscal year (i.e., whether to defer or phase the project), that current requests were reconciled with <br /> previous appropriations (i.e., unused amounts from previous appropriations were sufficient to carry the project through the coming fiscal <br /> yeaz), that the projects were not more appropriately funded through the operational budget (e.g., minor repairs), and that the projects were <br /> as equitably distributed geographically as possible while meeting the selection criteria discussed below. <br /> The selected projects met at least one of the following criteria (see Table 2): <br /> 1) Legal mandate-approximately $30.9M relates to unfunded mandates such as ADA, EPA gang cesspool prohibitions, and <br /> hazardous materials; <br /> 2) Corrects a major deficiency-approximately $52.3M relates to meeting basic level of service goals; <br /> 3) Critical for public safety or health-approximately $14.4 relates to protection of public safety (e.g., emergency response, flood <br /> control, crime control, traffic safety) or public health (hazazdous waste); <br /> 4) Environment/lifestyle-approximately $6M relates to proactive programs that relate to community planning initiatives, water <br /> quality improvements, or healthy lifestyles; <br /> 5) Improves operational efficiency or maintains/improves existing assets-approximately $36.2M enhances delivery of services or <br /> maintains existing assets. <br /> Of the 85 Capital Budget projects, 27 are new facilities or miscellaneous improvements ($69.3M), 19 are replacement of existing facilities <br /> ($38.8M), 29 are improvements to existing facilities ($30.6M), and 10 are various combinations of new, existing, or replacements <br /> ($1.9M) (see Table 3). Approximately 47% of the budget is for public health and safety projects ($65.SM), followed by culture/recreation <br /> (27% or $39.SM), transportation projects (13% or $17.9M), and general government facilities (13% or $17.7M) (see Table 4). <br /> Funding Sources <br /> Capital projects are typically funded by debt (bonds, State Revolving Fund loans), revenue sources (fuel tax, other special revenues), State <br /> grants, and various federal grant or loan sources. The Capital Budget presented herein includes those capital projects intended to be <br /> funded in whole or part by bonds or special revenues, fair share contributions, or State Revolving Fund loans. The Capital Budget also <br /> includes appropriations to receive specified Federal and State grants. <br /> a <br /> <br />