Laserfiche WebLink
<br /> I've witnessed a drainage code go from 10-year flood design to 100-year to 25-year hke you <br /> <br /> were bartering for dry goods at a market. Do not change technical codes 1>7ce this without sound <br /> engineering principals to back up your argument. Copying something from a California code or <br /> <br /> listening to an administrative engineer with zero design experience is not the way to go. Please, <br /> get the FEMA requirements met and then take a good, long hard look at what you are doing and <br /> WHY you are doing it. And don't forget HOW you are going to fund the enforcement of <br /> whatever you decide. <br /> <br />