My WebLink
|
Help
|
About
|
Sign Out
Home
COM 0176.170 2006-2008
ClerkCouncil
>
Council Records
>
Communications
>
2006-2008
>
COM 0176.170 2006-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2008 11:27:33 PM
Creation date
5/8/2008 6:45:48 PM
Metadata
Fields
Template:
Communications
Communications - Type
COM
Communications - Council Term
2006-2008
Communication
0176
Point
170
Author
Stacy Higa, Councilmember
Communications - Referred To
COUNCIL
Comments
Presented: Council - 11/7/07
Document Relationships
AGE COUNCIL 2007/11/07 2006-2008
(Related)
Path:
\Council Records\Agendas\2006-2008\Council
BIL 051 Draft 05 2006-2008
(Related)
Path:
\Council Records\Bills\2006-2008
BIL 051 Draft 05 2006-2008
(Related To)
Path:
\Council Records\Bills\2006-2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pete Hoffmann, Chair and <br /> Members of the Hawaii County Council <br /> October 29, 2007 <br /> <br /> Page 10 <br /> alteration or relocation of a watercourse, and <br /> submit evidence of such notification to the <br /> [ ~ ~l <br /> Federal Emergency Management Agency. <br /> Whenever a proposed alteration or <br /> relocation occurs that would significantly <br /> change the base flood elevation or result <br /> in a mappable alteration of the <br /> boundaries of any special flood hazard <br /> area, technical and scientific data through <br /> the Conditional Letter of Map Revision <br /> (CLOMR) shall be submitted to and <br /> approved by the Federal Emergency <br /> Management Agency. Such a submission <br /> is necessary so that upon completion of <br /> those physical changes affecting flooding <br /> conditions, risk premium rates and <br /> floodplain management requirements will <br /> be based upon current data. Work to be <br /> performed under an approved <br /> Conditional Letter of Map Revision <br /> (CLOMR) shall be subject to the <br /> following: <br /> Work shall not begin any on-site <br /> development affecting or <br /> impacting the floodplain until an <br /> approved Conditional Letter of <br /> Map Revision is received from the <br /> Federal Emergency Management <br /> Agency' <br /> Within sixty (601 days of receiving <br /> final approval from director of <br /> public works for the completion of <br /> the alteration or relocation of a <br /> watercourse, the request for a <br /> Letter of Map Revision (LOMR), <br /> and all other information required <br /> by the Letter of Map Revision <br /> (LOMR) process shall be <br /> submitted to the Flood Plain <br /> Administrator. <br /> Page 16 27-17 Pre-construction and post-construction certification of <br /> elevation and floodproofing of new construction, <br /> improvements to repetitive loss structures development, <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.