My WebLink
|
Help
|
About
|
Sign Out
Home
COM 0598.036 2006-2008
ClerkCouncil
>
Council Records
>
Communications
>
2006-2008
>
COM 0598.036 2006-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2008 10:11:47 PM
Creation date
5/8/2008 6:52:13 PM
Metadata
Fields
Template:
Communications
Communications - Type
COM
Communications - Council Term
2006-2008
Communication
0598
Point
036
Author
David M. Ross, Jr.
Communications - Referred To
PWIRC
Comments
Presented: PWIRC - 12/4/07
Document Relationships
AGE PWIRC 12/04/2007 2006-2008
(Related)
Path:
\Council Records\Agendas\2006-2008\Public Works & Intergovernmental Relations Committee (PWIRC)
COM 0598.000 2006-2008
(Related)
Path:
\Council Records\Communications\2006-2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> b. Other areas: Zone X (shaded) floor two feet was determined. If there is no flood base <br /> For new construction, the lowest floor shall be level determined, what if the flood base level is 3 feet <br /> elevated at least two feet above the adjacent above grade for a property? Requiring the building to <br /> grade. be 2 feet above grade will still have the lower floor <br /> 2. For concrete basements with habitable room(s), within a flood zone. Similazly, if the base flood level is <br /> the sill plate shall be at least one foot above the at the grade level of a property, chances that the flood <br /> adjacent grade. level will be that high is "minimal" as the definition of <br /> 3. New construction shall be required to provide Zone X (shaded) is "where average depths are less than <br /> drainage around and away from proposed one-foot" within one-hundred-years. <br /> structures. <br /> 4. The director or designated representative may Item 4 appears to put the burden on the owner or <br /> wave this requirement when topographical data developer [o prove that the property is not within a <br /> or evidence, submitted by a civil engineer or flood area and to take on the cost of having a survey <br /> land surveyor currently licensed in the State of done on the property. <br /> Hawaii, indicates that there are no apparent <br /> flood hazards to the proposed structure. This <br /> provision, i.e. subsection 27-18(b), upon <br /> approval of this ordinance, shall take effect on <br /> March 31, 2008. <br /> Section 27-18. Standards for construction. Since Zone X (unshaded) does not have an established <br /> c. Within Zone X (unshaded) base flood elevation, new construction required to <br /> I. For new construction, the lowest floor shall be comply with the Fair Housing Act will not be able to <br /> elevated at least one foot above the adjacent apply the site impracticability exception of FHAAG #1, <br /> grade. Section 2(b) which states: <br /> 2. For concrete basements with habitable room(s), "Site impracticability due to unusual characteristics. <br /> the sill plate shall be at least one foot above the Unusual characteristics include sites located in a <br /> adjacent Bade. federally-designated floodplain or coastal high-hazard <br /> 3. New construction shall be required to provide area and sites subject to other similar requirements of <br /> drainage around and away from proposed law or code that the lowest floor or the lowest <br /> structures. structural member of the lowest floor must be raised to <br /> 4. The director or designated representative may a specified level at or above the base flood elevation. " <br /> wave this requirement when topographical data <br /> or evidence, submitted by a civil engineer or It is not clear how the requirement to raise the lower <br /> land surveyor currently licensed in the State of floor one foot was determined. If there is no flood base <br /> Hawaii, indicates that there aze no apparent level determined, what if the flood base level is 3 feet <br /> flood hazazds to the proposed structure. This above grade for a property? Requiring the building to <br /> provision, i.e. subsection 27-18(b), upon be one foot above grade will still have [he lower floor <br /> approval of this ordinance, shall take effect on within a flood zone. Similarly, if the base flood level is <br /> March 31, 2008. at the grade level of a property, chances that the flood <br /> level will be that high is "minimal" as the definition of <br /> Zone X (unshaded) "is an area of minimal flood hazard <br /> corresponding to areas outside of the five-hundred-year <br /> floodplain." <br /> Item 4 appears to put the burden on the owner or <br /> developer to prove that the property is not within a <br /> flood area and to take on the cost of having a survey <br /> done on the property. <br /> Section 27-20. Standards for subdivisions and other The bill does not establish or define what constitutes <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.