My WebLink
|
Help
|
About
|
Sign Out
Home
COM 1007.000 2006-2008
ClerkCouncil
>
Council Records
>
Communications
>
2006-2008
>
COM 1007.000 2006-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2009 4:06:36 PM
Creation date
5/8/2008 7:04:46 PM
Metadata
Fields
Template:
Communications
Communications - Type
COM
Communications - Council Term
2006-2008
Communication
1007
Point
000
Author
William Takaba, Finance Director; Harry Kim, Mayor
Communications - Referred To
FC
Comments
FC: Postponed Bill 240 until the next FC meeting scheduled for March 11, 2008 - 2/20/08; FC: Postponed to Joint Committee on Public Works and Intergovernmental Relations, Finance and Planning held immediately following the committee meetings - 3/11/08; JConPWIRC/FC/PC-5: Recommends passage of Bill 240 on first reading - 3/11/08
Document Relationships
AGE FC 02/20/2008 2006-2008
(Related)
Path:
\Council Records\Agendas\2006-2008\Finance Committee (FC)
AGE FC 03/11/2008 2006-2008
(Related To)
Path:
\Council Records\Agendas\2006-2008\Finance Committee (FC)
BIL 240 Draft 01 2006-2008
(Related)
Path:
\Council Records\Bills\2006-2008
ORD 2008-060 2006-2008
(Related To)
Path:
\Council Records\Ordinances\2008
REP JConPWIRC/FC/PC 005 03/11/2008 2006-2008
(Related To)
Path:
\Council Records\Reports\2006-2008\Joint Committee on PWIRC/FC/PC
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br /> Form B-52 <br /> 7/18/91 <br /> <br /> DEPARTMENT OF FINANCE <br /> REQUEST FOR COUNCIL ACTION <br /> <br /> <br /> DEPARTMENT: Public Works DATE: February 4, 2008 <br /> <br /> <br /> STAFF CONTACT: Jiro Sumada PHONE: 961-8321 <br /> <br /> <br /> A. REQUEST: <br /> <br /> Amend Ordinance 07-83, the Capital Budget by adding an appropriation for: <br /> <br /> Mamalahoa Bypass Mitigation Measures $ 500,000.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> B. BACKGROUND AND JUSTIFICATION (USE ADDITIONAL SHEETS AS NEEDED): <br /> <br /> <br /> The project proposes to use Fair Share funding to construct traffic calming improvements on Alii Drive and Halekii Street to <br /> mitigate the anticipated increase in vehicle traffic caused by the opening of the Northern portion of the Mamalahoa Bypass. <br /> The opening of the Northern portion of the Bypass and the use of Halekii Street makai of Kona Scenic Park would provide <br /> South Kona motorists with an alternate route when traveling through Honalo, Kainaliu and Kealakekua towns. <br /> The Mamalahoa Bypass is a North-South arterial roadway between the end of Alii Drive in Keauhou and the Napoopoo <br /> Junction at Mamalahoa Highway. The Northern portion of the Bypass is scheduled to be completed in April 2008 and will <br /> be dedicated to the County soon thereafter. However, current zoning conditions, restrict the opening of Halekii Street until <br /> the entire roadway is completed all the way to the Napoopoo Junuction. <br /> A separate re-zoning change will be introduced to the County Council to amend the current zoning conditions to allow <br /> Halekii Street to be opened before the entire Bypass in completed. If this zoning change is passed, the potential opening of <br /> the Northern portion of the Bypass to the general public will increase the amount of traffic on Alii Drive in the Keauhou area <br /> and on Halekii Street. Both Alii Drive and Halekii Streets already have traffic problems with motorists speeding in the area. <br /> With an increase in traffic in both these areas, traffic calming measures are more urgently needed. <br /> During several meetings with the residents of the Keauhou and Halekii communities, several concerns surfaced about the <br /> increased potential for speeding and difficulties residents will encounter accessing their home with the more traffic after the <br /> Bypass is opened. To address these concerns, this project proposes to construct several traffic calming measures to slow <br /> down traffic on Alii Drive and Halekii Street to make these impacted areas safer for residents and motorists traveling <br /> through these communities. <br /> <br /> <br /> SIGNED: DATE: Z~¢ og <br /> Department Head <br />
The URL can be used to link to this page
Your browser does not support the video tag.