My WebLink
|
Help
|
About
|
Sign Out
Home
REP PC 020 01/22/2003 2002-2004
ClerkCouncil
>
Council Records
>
Reports
>
2002-2004
>
Planning Committee (PC)
>
REP PC 020 01/22/2003 2002-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2008 11:12:11 AM
Creation date
5/15/2008 10:23:56 PM
Metadata
Fields
Template:
Reports
Reports - Type
REP
Reports - Council Term
2002-2004
Report
20
Committee
PC
Meeting date
2003-01-22
Document Relationships
AGE PC 01/22/2003 2002-2004
(Related)
Path:
\Council Records\Agendas\2002-2004\Planning Committee (PC)
BIL 017 Draft 01 2000-2002
(Related To)
Path:
\Council Records\Bills\2000-2002
BIL 017 Draft 02 2000-2002
(Related)
Path:
\Council Records\Bills\2000-2002
BIL 017 Draft 02 2000-2002
(Related To)
Path:
\Council Records\Bills\2000-2002
COM 0060.000 2000-2002
(Related To)
Path:
\Council Records\Communications\2000-2002
COM 0060.000 2002-2004
(Related)
Path:
\Council Records\Communications\2002-2004
COM 0110.000 2002-2004
(Related To)
Path:
\Council Records\Communications\2002-2004
COM 0110.001 2002-2004
(Related To)
Path:
\Council Records\Communications\2002-2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Communication 60 <br />Bill 17 <br />Page 5 <br />then stated that he will not "vote against the previous determinations of the Planning Directors <br />that this was, although not mapped as such, it was part of the High Density area in the General <br />Plan." Mr. Yuen also explained that if the subject parcel were to be subdivided now, the <br />applicant would not be able to get subdivision approval within the floodway. <br />Mr. 'Cyler then quoted the t'harter in saying, °No public improvement project or subdivision or <br />zoning ordinance shall be initiated or adopted unless the same conforms to and implements the <br />General Plan." He then reiterated that. "IPs impossible for us to approve this, I don't care how <br />many conditions we have on iL because it violates the General Plan." <br />Committee Member Aaron Chung argued that although the subject property lies directly in the <br />flood plain, mitigating measures can be taken to remedy the situation so the applicant could <br />develop a part of the lot. <br />Director Chris Yuen then suggested that the following DO"f conditions be included in Bill No. 17 <br />as a means, so if there were any modifications to them, the Council would have the final say: <br />1. that the direct access be a right-in/right-out design <br />2. that the direct access be located as far as possible to the Volcano side of the <br />property <br />3. that the right-turn deceleration lane into Puainako Street tcom Kanoelehua Avenue <br />be extended <br />4. that aright-turn deceleration lane on Kanoelehuea Avenue into the development <br />he provided <br />5. that the Icft-turn from Puainako Street into the development be prohibited <br />6. that the development's Puainako access be right-in/right-out onl~~ <br />7. that the Puainako access be located as far as possible away from Kanoelehua <br />Avenue <br />8. that the traffic controls, i.e. possible signs and pavement markings. on Kanoelehua <br />Avenue be provided to prohibit traffic exiting the development from crossing <br />Kanoelehua Avenue to head west on Puainako <br />9. that other engineering and design parameters he considered. <br />He also suggested that the final three DO'f conditions he included: <br />1. Matsuno Enterprises will be subject to a fee for the enhanced value of the property <br />due to the new Kanoelehua access <br />2. A Traffic Impact Analysis Report ("LIAR) for the development will be required. <br />Should the I~IAK indicate that the development contributes to the need Ibr future <br />improvements to the Puainako Street/Kanoelehua Avenue Intersection. Matsuno <br />lnterprises will pay its fair share for the improvements <br />3. Matsuno Enterprises will be responsihle for the cost of all tral7ic control <br />adjustments needed as a result of granting of the Kanoelehua access. <br />
The URL can be used to link to this page
Your browser does not support the video tag.