My WebLink
|
Help
|
About
|
Sign Out
Home
COM 1282.000 2006-2008
ClerkCouncil
>
Council Records
>
Communications
>
2006-2008
>
COM 1282.000 2006-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2008 10:49:53 AM
Creation date
6/9/2008 3:52:02 PM
Metadata
Fields
Template:
Communications
Communications - Type
COM
Communications - Council Term
2006-2008
Communication
1282
Point
000
Author
Colleen Schrandt, Legislative Auditor
Communications - Referred To
PWIRC
Comments
PWIRC: Close File - 6/17/08
Document Relationships
AGE PWIRC 06/17/2008 2006-2008
(Related To)
Path:
\Council Records\Agendas\2006-2008\Public Works & Intergovernmental Relations Committee (PWIRC)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
specifically October 24, 2007, December 3, 2007, December 28, 2007, January 8, 2008, and <br />March 24, 2008. DPW was prompt in providing files that contained executed contracts, awarded <br />proposals, executed contract supplements and change orders, progress payment requests, and <br />departmental contract accounting spreadsheets. However, after receiving five written requests <br />and being granted two time extensions, DPW did not consistently provide auditors with files that <br />fully documented the professional services candidate selection or ranking process; the <br />construction bid proposal correction and revision process; the contract management process <br />(including project engineer design and construction estimations, time-cost estimations and <br />negotiations of contract supplements and change orders, and decisions not to pursue separate <br />competitive procurements for additional work); and the project management process (including <br />project inspector log books or notes documenting site, weather and contractor issues and <br />providing support documentation for time extensions or force account work). <br />Contract Supplements and Change Orders <br />Contract modifications need to be prepared in accordance with underlying contract terms, <br />Hawaii Revised Statutes, Hawaii Administrative Rules and the County Department of Public <br />Works General Requirements and Covenants. The necessity and reasons for contract <br />modifications and any negotiations preceding them also need to be properly documented to <br />support compliance with procurement and contract laws and procedures. Support documentation <br />should include a description of each specific change in contracted work and materials; its impact <br />on time for contract performance, if any; where and why the departure from original scope of <br />work is occurring; the method of verification of work performed, time billed and materials used; <br />and the amount and method of compensation. <br />However, the auditors found that the Department of Public Works does not adequately document <br />its contract modifications. For the contract modifications reviewed, DPW did not consistently <br />provide justification for either the contract change or the specific fee adjustment for each change. <br />Most contract modifications were not supported by documentation specifying who initiated the <br />change, why the change was necessary, DPW's internal estimate of reasonable time and costs <br />associated with the change, or negotiations of the change with the service provider or contractor. <br />DPW personnel interviewed indicated that requests for changes are usually verbal. <br />15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.