My WebLink
|
Help
|
About
|
Sign Out
Home
COM 1282.000 2006-2008
ClerkCouncil
>
Council Records
>
Communications
>
2006-2008
>
COM 1282.000 2006-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2008 10:49:53 AM
Creation date
6/9/2008 3:52:02 PM
Metadata
Fields
Template:
Communications
Communications - Type
COM
Communications - Council Term
2006-2008
Communication
1282
Point
000
Author
Colleen Schrandt, Legislative Auditor
Communications - Referred To
PWIRC
Comments
PWIRC: Close File - 6/17/08
Document Relationships
AGE PWIRC 06/17/2008 2006-2008
(Related To)
Path:
\Council Records\Agendas\2006-2008\Public Works & Intergovernmental Relations Committee (PWIRC)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHAPTER 5 SPECIFIC AUDIT FINDINGS: AUDIT OBJECTIVES <br />Audit findings are divided into two subject areas. Chapter 5 addresses specific findings relating <br />to the audit objectives outlined in Chapter 1. Chapter 6 presents general findings relating to <br />internal controls and the broader goals of contract management. In combination, Chapters 5 and <br />6 report specific and general audit findings that materially impact the Department of Public <br />Works' efforts to deliver capital improvement projects that sufficiently meet public needs in a <br />timely and economically prudent manner. These audit findings are followed by <br />Recommendations in Chapter 7 and our Conclusion in Chapter 8. <br />Audit Obieetive No. 1: Determine reasons for professional services contract supplements <br />and construction contract change orders. <br />• The Department of Public Works lacks adequate documentation to assess responsibility for <br />and identify specific reasons why contract supplements and changes orders are necessary. <br />Many times supplements simply state "additional design work" with no indication as to what <br />the work is, whether the additional work relates to the "end user" not realizing a need at the <br />time of scoping, or if it was an oversight on the part of the project engineer or consultant. <br />While change orders may delineate specific work to be performed, they often lack sufficient <br />documentation to determine whether the work may have been included in the originally <br />contracted scope, whether the work relates to an error or omission in site assessment or <br />design, or if it was due to an unforeseeable condition. <br />Please see Appendix for: <br />Table 5.1, Audit Sample -Contracts and Modifications. <br />Audit Obiective No. 2: Determine whether adequate procedures and controls exist to keen <br />contract supplements and change orders to a minimum. <br />• The Department of Public Works lacks adequate procedures and controls to keep <br />contract supplements and change orders to a minimum. <br />o Of the 14 professional services contracts in our audit sample, 10 or 71 % ref]ect a current <br />contract amount in excess of 110% of the County's original estimated project costs. <br />o Of the 14 construction contracts in our audit sample, 12 or 86% reflect a current contract <br />amount in excess of 110°l0 of the County's original estimated project costs. <br />Please see Appendix for: <br />Table 5.2, Variance between County Construction Estimate, <br />Lowest Bid and Revised Contract. <br />Table 5.2a, Variance between County Professional Services Estimate, <br />Negotiated Fee and Revised Contract. <br />16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.