My WebLink
|
Help
|
About
|
Sign Out
Home
COM 1282.000 2006-2008
ClerkCouncil
>
Council Records
>
Communications
>
2006-2008
>
COM 1282.000 2006-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2008 10:49:53 AM
Creation date
6/9/2008 3:52:02 PM
Metadata
Fields
Template:
Communications
Communications - Type
COM
Communications - Council Term
2006-2008
Communication
1282
Point
000
Author
Colleen Schrandt, Legislative Auditor
Communications - Referred To
PWIRC
Comments
PWIRC: Close File - 6/17/08
Document Relationships
AGE PWIRC 06/17/2008 2006-2008
(Related To)
Path:
\Council Records\Agendas\2006-2008\Public Works & Intergovernmental Relations Committee (PWIRC)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Executive Summary <br />The primary goals of construction contract management are to ensure that capital improvement <br />projects are delivered efficiently, effectively, equitably and with accountability. This is <br />accomplished through communication and implementation of and adherence to clearly detmed <br />internal controls. As outlined in the FY 2007-2008 CIP budget, the County of Hawaii proposed <br />approximately $748,675,000 in capital improvement projects to repair, improve and construct <br />County-owned facilities over the next six years. Of this six-year CIP projection, $323,669,000 is <br />estimated for completion of Department of Public Works projects. Professional services <br />contracts and construction contracts will account for most of these DPW expenditures, with <br />contract supplements and change orders representing a significant portion thereof if current <br />trends continue. <br />While contract supplements and change orders are routine components of construction <br />management and cannot be completely avoided, the accepted industry average is between +- or - <br />10% of original contract values. Of the 16 professional services contracts active during the FY <br />2006-2007 audit period, contract supplements issued to date represent a 90% increase over <br />original contract amounts. Of the 60 construction contracts active during the FY 2006-2007 audit <br />period, change orders issued to date range from -6% to +114% of original contract amounts. Of <br />the 14 professional services contracts and 14 construction contracts meeting our audit sample <br />criteria of greater than + or - 10% of original contract values (or outside the accepted industry <br />average), 64% remain open and exceed their original contractual completion dates and 50% <br />remain open and exceed their current contractual completion dates. <br />The Legislative Auditor initiated this limited scope performance audit to evaluate the <br />Department of Public Works' practices, policies and procedures for minimizing the need for and <br />controlling the timing and cost of professional services contract supplements and construction <br />contract change orders. While we did not find contract supplements or change orders issued for <br />unnecessary work, departmental policies and procedures and internal controls were found to be <br />inadequate resulting in contract supplements and change orders arising from avoidable or <br />foreseeable circumstances such as insufficient identification of user needs prior to project design <br />and construction (scoping), inadequate site assessment, errors or omissions in design plans and <br />specifications, and under- or over-estimation of project costs by professional services <br />consultants, construction contractors and/or County engineers. We also noted instances of <br />contract supplements and change orders issued for work outside the scope of original contracts. <br />While in certain instances, a cost savings may have been realized by the County when a <br />contractor already in the project area did not charge mobilization costs for additional work, <br />contract supplements and change orders need to be examined in light of their compliance with <br />procurement law and fair competition and impact on public perception and confidence. It is also <br />imperative that DPW develop, implement and adhere to sufficient internal control policies and <br />procedures to provide reasonable assurance that the possibility of undetected abuse relating to <br />supplements and change orders is kept to an acceptable level. <br />While the Department of Public Works' practices, policies, and procedures for monitoring and <br />control of contract supplements and change orders were the focus of this limited scope <br />performance audit, the Legislative Auditor also determined that several extra-departmental and <br />