Laserfiche WebLink
1.3 PROPOSED SCOPES OF WORK AND COST ESTIMATE <br />To fulfill the principal project objectives, a scope of work and associated <br />costs has been developed for consideration. The work falls into two <br />categories: (1) landfill physical/ chemical investigation to address <br />Objective 1; and (2) a demonstration subsurface fire suppression project to <br />extinguish an existing fire and determine the efficacy of the fire retardant <br />foam suppression technique, as per Objective 2. <br />ERM has developed cost estimate for the various scope elements based on <br />technical experience and price quotations from analytical laboratories and <br />for subcontracted services. <br />ERM 4 KAILUA-KONA LANDFILL/ 0061204 - 3/14/2008 <br />