Laserfiche WebLink
occur upon the completion of construction or acceptance of financial assurance <br /> thereof, whichever occurs first, for the first stage of Connector Road I. The first <br /> stage shall consist of a preliminary vehicular access hereinafter defined as road <br /> i~rovements constructed to non-dedicable standards meetingwith the safety and <br /> design reduirements of the Department of Public Works. Construction of the <br /> first stage shall be completed prior to the issuance of the County's approval of <br /> occupancy for any_portion of the Project Area. The second stage shall consist of <br /> up~radin~ the preliminary_vehicular access to dedicable standards meeting with <br /> the approval of the Department of Public Works, and which shall be constructed <br /> concurrently with the development of the lands immediately fronting ector <br /> Road I. The portion of the Connector Road I through TMK: 1-6-146: 017 shall <br /> be developed consistent with the existing roadway standards within the Shipman <br /> Business Park. The remainder of the road from the Shipman Business Park <br /> boundary to Road A shall include curb, gutter, and sidewalk improvements. <br /> <br /> L. The applicant shall construct a minimum eight-foot wide pedestrian/bike path <br /> within a minimum twelve-foot wide right-of--way from the underpass on the <br /> Volcano Highway to the proiect area in_general conformance with the ali n <br /> shown on Exhibit "A". The pedestrian/bike path shall be completed and available <br /> for use prior to the issuance of the County's approval for occupancy of any <br /> portion of the pro.,ject area. <br /> M. The applicant shall construct a second connector road ("Connector Road 2"), <br /> meeting with the approval of the Department of Public Works, between <br /> Melekahiwa Street/Road A and the Keaau-Pahoa Road Extension prior to the <br /> County's issuance of the ap rp oval of occupancy for any development within the <br /> Keaau Gateway Project Area Phase IIa as shown on Exhibit "A" attached hereto. <br /> Final design including_pre~aration of construction drawings for Connection Road <br /> 2 shall be financially assured as part of final subdivision approval for andportion <br /> -5- <br /> <br />